Arkansas Highway and Transportation Department - Lane Closures

Neither the map nor the text report show short-term lane closures (those where the lane is closed for less than 4 hours) or moving lane closures necessary for some maintenance or construction activities. For information on short-term closures or moving lane closures, please contact the District Engineer for the District or county in question. An underlined "Begin Date" represents planned closures.

Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
6Saline50803.253.30Width Restriction Only05/18/2012Ongoing24 Hours12.00FT 9.00Width Restriction - Southbound Lanes Only. 12ft lane with no shoulder on Job 061228.
6Pulaski50903.823.87Width Restriction Only05/09/2012Ongoing24 Hours10.00FT 7.00Width Restriction - All Lanes. 10ft lanes and 2 ft shoulders, Job 060352
8Conway90809.0720.40Width Restriction Only05/17/2012Ongoing7 a.m. - 7 p.m.12.00FT 9.00Asphalt Paving Operation. Job FS8019
5Izard91302.394.47Width Restriction Only07/02/2010Ongoing24 Hours11.00FT 8.50Width Restriction - All Lanes.
10Craighead1804017.0923.03East & West Bound05/01/2012Ongoing24 Hours11.00FT 11.00Width Restriction - All Lanes. Job No. 100308
10Mississippi180603.575.91East & West Bound10/04/2010Ongoing24 Hours11.00FT 11.00Width Restriction - All Lanes. Shoulder Closed for Construction of Job 100307.
10Mississippi1806016.5716.64West Bound Outside04/30/2012Ongoing24 hours FT  Utility work for Project 100740
3Sevier240107.008.70Alternating East & West Bound05/21/201258 a.m. - 4 p.m.13.00FT 10.00Bridge Deck Repairs. WIDTH RESTRICTION
8Yell280405.8010.69Alternating East & West Bound05/07/2012ongoing7 a.m.- 7 p.m.12.00FT 12.00Asphalt Paving Operation and Shoulder Work.
3Miller301102.684.12Right Shoulder05/03/2011ongoing24 hrs14.00FT 11.00Job 030378, Concrete Barrier placed along outside lanes for construction operations.
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
3Miller301102.704.10East Bound Outside03/07/2012ONGOING9 am - 3 pm12.00FT 9.00030378 - Lane closure to remove barrier wall, mill and lay asphalt on shoulders.
3Miller301102.704.10West Bound Outside03/07/2012ONGOING9am - 3pm12.00FT 9.00030378 - Lane closure to remove barrier wall, mill and lay asphalt on outside shoulders.
3Hempstead3012022.5029.60East Bound Outside05/16/201238 a.m. - 5 p.m. FT 12.00Alternating inside
7Clark3014080.3080.50West Bound Inside05/21/201217 am to 5 pm15.00FT 12.00Bridge deck repair on DeRoach Cr Br Clark Hot Sprg Co Line
7Clark3014080.3080.50West Bound Outside05/22/201217 am to 5 pm15.00FT 12.00Bridge deck repair on DeRoach Cr Br Clark Hot Sprg County line
3Hempstead320400.000.20All05/20/201216 a.m. - 6 p.m. FT  *ROAD CLOSED* USE ALTERNATE ROUTE. MAINTENANCE WORK ON MILLWOOD DAM
8Faulkner40320125.20133.40East Bound Inside01/27/20121307 p.m. - 6 a.m. FT 12.00Lane closure in conjunction with Job 080388
8Faulkner40320125.20133.40West Bound Inside01/27/20121308 p.m.-7 a.m. FT 12.00In conjunction with night work on Job 080388
6Pulaski40330138.86142.00West Bound Inside05/15/20121/21 P.M. TO 3 P.M. FT  Moving lane closure for core samples on left shoulder
6Pulaski40330138.86142.00West Bound Inside05/21/201219 A.M. TO 3 P.M. FT  Moving lane closure for core samples.
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
6Pulaski40330138.86142.00West Bound Inside05/16/20121/29 A.M. TO 12 P.M. FT  Moving lane closure for core samples in left shoulder
6Pulaski40330138.86142.00East Bound Inside05/17/201219 AM TO 3 P.M. FT  Moving lane closure for core samples in left shoulder
6Prairie40420193.50205.40East Bound Outside01/04/2012Ongoing24 Hours11.00FT 8.50Job 061187 - Construction
6Prairie40420193.50205.40West Bound Outside01/04/2012Ongoing24 Hours11.00FT 8.50Job 061187 - Construction
6Prairie40420198.50199.50East & West Bound01/04/2012On Going24 hrs FT  White River Rest Area closed east and west bound due to Main Lane closed by Contractor
1Monroe40430205.40215.74Width Restriction Only01/04/2012On going24 Hours FT 8.50East and west bound
1Crittenden40520281.00282.00West Bound Outside05/16/201229:00 a.m. - 3:00 p.m. FT  TDOT ITS maintenance work
3Little-River410200.000.38Alternating North & South Bound05/21/201247:30am to 5:00pm13.00FT 10.00Superstructure repairs to the Hwy. 41 Little River Bridge by HBM.
9Boone430206.907.00North Bound04/26/2011Ongoing24 Hours FT 12.00NB lane closed due to slide.
4Sebastian450100.200.40North Bound05/02/2012824 Hours13.00FT 10.00Work in conjunction with UD04-11-250
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
4Sebastian450203.103.80Right Shoulder06/16/2011Ongoing2412.00FT 9.00Both shoulder will be closed for roadwork. Project 040238.
2Jefferson540800.941.15Left Shoulder05/03/20124524 hours12.00FT 14.00Width Restriction
10Mississippi5512061.2668.99North & South Bound06/01/2011ongoing24 hours12.00FT 10.00Crossover-both directions on Northbound side. Construction Project 100716
4Crawford5905010.4011.10Alternating North & South Bound05/15/201238:00 a.m. - 4:30 p.m.14.00FT14.0011.00Inspection of Bridge over Natural Dam
10Mississippi6103016.3516.39South Bound Outside04/30/2012Ongoing24 hours FT  Utility work for Project 100740
10Lawrence6303019.5521.83Width Restriction Only04/14/2010Ongoing24 Hours11.00FT 11.00Width Restriction - All Lanes. Job No. 100646
3Hempstead6702015.8016.20North & South Bound08/08/2011Ongoing24 hours FT  Job 030152 Temporary Detour. No change in Horizontal or Vertical Clearance.
3Hempstead6702019.4019.70North & South Bound09/02/2011Ongoing24 Hrs FT 12.00Width Restriction - All Lanes. Job No. 030152
3Hempstead6702019.8020.00North & South Bound07/13/2011Ongoing24 Hours FT  Job 030152 Temporary Detour. No change in Horizontal or Vertical Clearance
3Hempstead6702020.0020.40North & South Bound10/07/2011Ongoing24 Hours FT 12.00Job 030152 - Width Restriction all lanes - Temporary Detour.
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
6Hot-Spring670704.644.86Alternating North & South Bound05/21/201247:30am to 5:00pm14.00FT 11.00Spot cleaning and painting the Hwy. 67 Ouachita River Bridge by HBM.
6Hot-Spring6707017.8217.90Alternating North & South Bound04/16/2012On Going24 FT 12.00Traffic Controled by Temporary Traffic Control Signal
6Pulaski671007.209.20North Bound Outside05/14/20124 DAYS9AM-3PM FT  BRIDGE PARAPET RAIL REPAIR "ACCIDENT"
6Pulaski671007.209.20North Bound Outside05/14/20124 DAYS9 A.M. TO 3 P.M. FT 12.00BRIDGE PARAPET RAIL REPAIR "ACCIDENT"
3Sevier700207.317.50Alternating East & West Bound05/15/201238a.m. - 4p.m.13.00FT 10.00Width restrictions. Bridge Deck Repairs
3Pike700405.565.63Alternating East & West Bound05/23/201227:30am to 5:00pm13.00FT 10.00Maintenance repairs to the Hwy. 70 Little Missouri River Bridge by HBM.
6Garland700900.230.60Alternating East & West Bound05/22/201229 A.M. TO 3 P.M. FT  ROAD SURFACE REPAIR
6Garland700909.3610.26West Bound Inside05/14/20121 DAY9AM-11AM15.00FT 12.00SIGN AND POST INSTALLATION
6Garland7009B5.505.60All12/12/2011Ongoing24 Hrs FT18.00 Job No. 061285, Installing Structural Steel Beams and Safety Platforms Will Reduce Vert. Cl.
6Prairie701607.4019.90Width Restriction Only01/04/2012OngoingOngoing FT 8.50Job 061187 - Routing to avoid I-40 and Hwy. 70
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
1Monroe701700.007.73Width Restriction Only01/04/2012On going24 Hours FT 8.50 
3Miller710305.756.75North Bound Inside05/07/201258am - 6pm12.00FT 9.00Job 030378. Inside NB closure to install RCPC. This section is inTexas - For Info Only.
3Little-River710400.000.60North Bound05/16/201278a.m. - 4p.m20.00FT 17.00Alternate inside/outside lanes. Bridge Repairs
3Little-River710400.000.60South Bound05/21/201228 a.m. - 4 p.m.19.00FT 16.00Bridge Repairs. Width Restriction
4Sebastian7114B1.722.22South Bound Outside05/07/201247:00 p.m.-6:00 a.m.12.00FT 9.00Work in conjunction with SP04-11-033
4Sebastian7114B1.722.22North Bound Outside05/07/201247:00 p.m.-6:00 a.m.12.00FT 9.00Work in conjunction with SP04-11-033
6Prairie860204.808.50Alternating East & West Bound05/22/201239 A,M. TO 3 P.M. FT  Chip sealing operation
8Johnson1090400.870.87All05/20/201218 a.m. - 5 p.m. FT  Union Pacific Railroad crossing closed for track repairs
7Dallas1670700.004.40Width Restriction Only11/08/2010Ongoing24 Hours13.00FT 10.00Width Restriction in All Lanes with Shoulders Closed, Job 070288.
7Cleveland1670802.116.90Width Restriction Only04/21/2011Ongoing24 Hours12.00FT 9.00Box Culvert work.
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
5Sharp16719022.1923.24North & South Bound05/11/2012Ongoing24 Hours11.00FT 8.00Width Restriction - All Lanes.
6Pulaski1760200.003.00Alternating East & West Bound05/07/2012147 pm to 6 am FT  Job 061369 Kiehl Ave. Mill and Inlay
9Marion17801011.4611.91East Bound12/05/20112412410.00FT 10.00Temporary signals will be used for Traffic Control
3Hempstead1950100.540.79North & South Bound08/10/2010Ongoing24 Hours FT  Temporary Detour. No change in Horizontal or Vertical Clearance.
3Miller2450105.007.70South Bound07/20/2011ongoing24 hrs12.00FT 9.00Job 030378. SB lanes to use NB lanes with median crossovers. 1 lane each direction.
3Miller2450106.026.35South Bound Off Ramp01/30/2012permanentongoing FT  Job 030378 - Ramp to be removed permanently as part of construction project.
3Miller2450106.026.35South Bound On Ramp01/30/2012permanentongoing FT  Job 030378 - Ramp will be permantly removed as part of construction project.
4Washington2650202.692.80North Bound Center05/17/20125 9:00 a.m.-3:00 p.m.11.00FT 10.00Width Restriction - All Lanes. Installing Pavement Drainage Structure.
4Washington2650203.604.50North Bound Outside12/27/2011Ongoing24 Hours11.00FT 8.00Width Restriction - All Lanes. Center lane will be closed. Box culvert work.
6Garland2700502.406.50Width Restriction Only10/17/2011Ongoing24 hours11.00FT 11.00Detour in place to allow Contractor to extend pipe and box culvert.
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
4Sebastian2710103.003.20North Bound Outside05/07/201247:00 p.m.-6:00 a.m.12.00FT 9.00Work in conjunction with SP04-11-033
3Nevada3710402.813.10Alternating North & South Bound05/24/201227 a.m. - 5 p.m.19.00FT 16.00Bridge Deck Repairs. WIDTH RESTRICTION
9Madison4120305.447.87Width Restriction Only05/15/2012on going24 Hours13.00FT 10.00East and West Bound Lanes width restriction
6Pulaski4302105.346.53North Bound Outside05/27/2011Ongoing24 hours FT  Job 061244: This lane closure will begin on Friday at 5 am
6Pulaski4302106.506.55South Bound Off Ramp03/23/2012ongoing24 hours FT14.00 Job 061244: Placement of safety platforms will reduce the vertical clearance.
6Pulaski4302106.758.25South Bound Outside03/14/2011ongoing24 hours FT  Job 061244: Placement of concrete barrier walls, 2 lanes of mainlane traffic will be open.
2Grant53004016.3817.77South Bound Inside02/29/20122102416.00FT 14.00Crossover-both directions on Southbound side.
2Grant53004016.3817.78North Bound Inside04/27/20121502414.00FT 12.00Crossover-both directions on Southbound side.
2Jefferson53005017.7823.77North Bound Inside04/27/20121502414.00FT 12.00Crossover-both directions on Southbound side.
2Jefferson53005017.7823.77South Bound Inside02/29/20122102416.00FT 14.00Crossover-both directions on Southbound side.
Dist.CountyRouteSectionBegin Mile MarkerEnd Mile MarkerLane(s) ClosedBegin DateApprox. DaysTimeHor. Clr.UnitVert. Clr.Max. Width LoadComments................
4Sebastian5400104.044.80East & West Bound06/13/2011Ongoing24 hours12.00FT 9.00Width Restriction - All Lanes. Barrier wall installed, both shoulder closed. Project 040238
4Washington54004042.0143.87North Bound Outside05/23/201227:30am to 5:00pm20.00FT 17.00Inspection of the I-540 Blackburn Creek, Deadman Hollow and Hess Creek Bridges by HBM.
9Benton54005075.7578.25South Bound Inside01/22/2012ONGOING8 PM-6:30 AM FT 12.00DITCH PAVING
9Benton54005081.1183.11North Bound Inside05/07/201258pm - 6am FT 12.00Installing cable in median.
6Pulaski6302106.827.03All04/11/2011Ongoing24 Hours FT14.00 Job 061244: Placement of safety platforms will reduce the vertical clearance.
6Pulaski6302106.917.29West Bound05/07/201259 a.m. to 3 p.m. FT  Job 061244: Temp. Barrier wall relocation on Westbound I-630.
6Pulaski6302107.307.40North Bound Outside05/07/201259 am to 3 pm FT  Job 061244: On Shackleford 1000 ft north and south of I-630 and Fin. Cent Pkwy