| Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 6 | Saline | 5 | 080 | 3.25 | 3.30 | Width Restriction Only | 05/18/2012 | Ongoing | 24 Hours | 12.00 | FT | | 9.00 | Width Restriction - Southbound Lanes Only. 12ft lane with no shoulder on Job 061228. |
| 6 | Pulaski | 5 | 090 | 3.82 | 3.87 | Width Restriction Only | 05/09/2012 | Ongoing | 24 Hours | 10.00 | FT | | 7.00 | Width Restriction - All Lanes. 10ft lanes and 2 ft shoulders, Job 060352 |
| 8 | Conway | 9 | 080 | 9.07 | 20.40 | Width Restriction Only | 05/17/2012 | Ongoing | 7 a.m. - 7 p.m. | 12.00 | FT | | 9.00 | Asphalt Paving Operation. Job FS8019 |
| 5 | Izard | 9 | 130 | 2.39 | 4.47 | Width Restriction Only | 07/02/2010 | Ongoing | 24 Hours | 11.00 | FT | | 8.50 | Width Restriction - All Lanes. |
| 10 | Craighead | 18 | 040 | 17.09 | 23.03 | East & West Bound | 05/01/2012 | Ongoing | 24 Hours | 11.00 | FT | | 11.00 | Width Restriction - All Lanes. Job No. 100308 |
| 10 | Mississippi | 18 | 060 | 3.57 | 5.91 | East & West Bound | 10/04/2010 | Ongoing | 24 Hours | 11.00 | FT | | 11.00 | Width Restriction - All Lanes. Shoulder Closed for Construction of Job 100307. |
| 10 | Mississippi | 18 | 060 | 16.57 | 16.64 | West Bound Outside | 04/30/2012 | Ongoing | 24 hours | | FT | | | Utility work for Project 100740 |
| 3 | Sevier | 24 | 010 | 7.00 | 8.70 | Alternating East & West Bound | 05/21/2012 | 5 | 8 a.m. - 4 p.m. | 13.00 | FT | | 10.00 | Bridge Deck Repairs. WIDTH RESTRICTION |
| 8 | Yell | 28 | 040 | 5.80 | 10.69 | Alternating East & West Bound | 05/07/2012 | ongoing | 7 a.m.- 7 p.m. | 12.00 | FT | | 12.00 | Asphalt Paving Operation and Shoulder Work. |
| 3 | Miller | 30 | 110 | 2.68 | 4.12 | Right Shoulder | 05/03/2011 | ongoing | 24 hrs | 14.00 | FT | | 11.00 | Job 030378, Concrete Barrier placed along outside lanes for construction operations. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 3 | Miller | 30 | 110 | 2.70 | 4.10 | East Bound Outside | 03/07/2012 | ONGOING | 9 am - 3 pm | 12.00 | FT | | 9.00 | 030378 - Lane closure to remove barrier wall, mill and lay asphalt on shoulders. |
| 3 | Miller | 30 | 110 | 2.70 | 4.10 | West Bound Outside | 03/07/2012 | ONGOING | 9am - 3pm | 12.00 | FT | | 9.00 | 030378 - Lane closure to remove barrier wall, mill and lay asphalt on outside shoulders. |
| 3 | Hempstead | 30 | 120 | 22.50 | 29.60 | East Bound Outside | 05/16/2012 | 3 | 8 a.m. - 5 p.m. | | FT | | 12.00 | Alternating inside |
| 7 | Clark | 30 | 140 | 80.30 | 80.50 | West Bound Inside | 05/21/2012 | 1 | 7 am to 5 pm | 15.00 | FT | | 12.00 | Bridge deck repair on DeRoach Cr Br Clark Hot Sprg Co Line |
| 7 | Clark | 30 | 140 | 80.30 | 80.50 | West Bound Outside | 05/22/2012 | 1 | 7 am to 5 pm | 15.00 | FT | | 12.00 | Bridge deck repair on DeRoach Cr Br Clark Hot Sprg County line |
| 3 | Hempstead | 32 | 040 | 0.00 | 0.20 | All | 05/20/2012 | 1 | 6 a.m. - 6 p.m. | | FT | | | *ROAD CLOSED* USE ALTERNATE ROUTE. MAINTENANCE WORK ON MILLWOOD DAM |
| 8 | Faulkner | 40 | 320 | 125.20 | 133.40 | East Bound Inside | 01/27/2012 | 130 | 7 p.m. - 6 a.m. | | FT | | 12.00 | Lane closure in conjunction with Job 080388 |
| 8 | Faulkner | 40 | 320 | 125.20 | 133.40 | West Bound Inside | 01/27/2012 | 130 | 8 p.m.-7 a.m. | | FT | | 12.00 | In conjunction with night work on Job 080388 |
| 6 | Pulaski | 40 | 330 | 138.86 | 142.00 | West Bound Inside | 05/15/2012 | 1/2 | 1 P.M. TO 3 P.M. | | FT | | | Moving lane closure for core samples on left shoulder |
| 6 | Pulaski | 40 | 330 | 138.86 | 142.00 | West Bound Inside | 05/21/2012 | 1 | 9 A.M. TO 3 P.M. | | FT | | | Moving lane closure for core samples. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 6 | Pulaski | 40 | 330 | 138.86 | 142.00 | West Bound Inside | 05/16/2012 | 1/2 | 9 A.M. TO 12 P.M. | | FT | | | Moving lane closure for core samples in left shoulder |
| 6 | Pulaski | 40 | 330 | 138.86 | 142.00 | East Bound Inside | 05/17/2012 | 1 | 9 AM TO 3 P.M. | | FT | | | Moving lane closure for core samples in left shoulder |
| 6 | Prairie | 40 | 420 | 193.50 | 205.40 | East Bound Outside | 01/04/2012 | Ongoing | 24 Hours | 11.00 | FT | | 8.50 | Job 061187 - Construction |
| 6 | Prairie | 40 | 420 | 193.50 | 205.40 | West Bound Outside | 01/04/2012 | Ongoing | 24 Hours | 11.00 | FT | | 8.50 | Job 061187 - Construction |
| 6 | Prairie | 40 | 420 | 198.50 | 199.50 | East & West Bound | 01/04/2012 | On Going | 24 hrs | | FT | | | White River Rest Area closed east and west bound due to Main Lane closed by Contractor |
| 1 | Monroe | 40 | 430 | 205.40 | 215.74 | Width Restriction Only | 01/04/2012 | On going | 24 Hours | | FT | | 8.50 | East and west bound |
| 1 | Crittenden | 40 | 520 | 281.00 | 282.00 | West Bound Outside | 05/16/2012 | 2 | 9:00 a.m. - 3:00 p.m. | | FT | | | TDOT ITS maintenance work |
| 3 | Little-River | 41 | 020 | 0.00 | 0.38 | Alternating North & South Bound | 05/21/2012 | 4 | 7:30am to 5:00pm | 13.00 | FT | | 10.00 | Superstructure repairs to the Hwy. 41 Little River Bridge by HBM. |
| 9 | Boone | 43 | 020 | 6.90 | 7.00 | North Bound | 04/26/2011 | Ongoing | 24 Hours | | FT | | 12.00 | NB lane closed due to slide. |
| 4 | Sebastian | 45 | 010 | 0.20 | 0.40 | North Bound | 05/02/2012 | 8 | 24 Hours | 13.00 | FT | | 10.00 | Work in conjunction with UD04-11-250 |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 4 | Sebastian | 45 | 020 | 3.10 | 3.80 | Right Shoulder | 06/16/2011 | Ongoing | 24 | 12.00 | FT | | 9.00 | Both shoulder will be closed for roadwork. Project 040238. |
| 2 | Jefferson | 54 | 080 | 0.94 | 1.15 | Left Shoulder | 05/03/2012 | 45 | 24 hours | 12.00 | FT | | 14.00 | Width Restriction |
| 10 | Mississippi | 55 | 120 | 61.26 | 68.99 | North & South Bound | 06/01/2011 | ongoing | 24 hours | 12.00 | FT | | 10.00 | Crossover-both directions on Northbound side. Construction Project 100716 |
| 4 | Crawford | 59 | 050 | 10.40 | 11.10 | Alternating North & South Bound | 05/15/2012 | 3 | 8:00 a.m. - 4:30 p.m. | 14.00 | FT | 14.00 | 11.00 | Inspection of Bridge over Natural Dam |
| 10 | Mississippi | 61 | 030 | 16.35 | 16.39 | South Bound Outside | 04/30/2012 | Ongoing | 24 hours | | FT | | | Utility work for Project 100740 |
| 10 | Lawrence | 63 | 030 | 19.55 | 21.83 | Width Restriction Only | 04/14/2010 | Ongoing | 24 Hours | 11.00 | FT | | 11.00 | Width Restriction - All Lanes. Job No. 100646 |
| 3 | Hempstead | 67 | 020 | 15.80 | 16.20 | North & South Bound | 08/08/2011 | Ongoing | 24 hours | | FT | | | Job 030152 Temporary Detour. No change in Horizontal or Vertical Clearance. |
| 3 | Hempstead | 67 | 020 | 19.40 | 19.70 | North & South Bound | 09/02/2011 | Ongoing | 24 Hrs | | FT | | 12.00 | Width Restriction - All Lanes. Job No. 030152 |
| 3 | Hempstead | 67 | 020 | 19.80 | 20.00 | North & South Bound | 07/13/2011 | Ongoing | 24 Hours | | FT | | | Job 030152 Temporary Detour. No change in Horizontal or Vertical Clearance |
| 3 | Hempstead | 67 | 020 | 20.00 | 20.40 | North & South Bound | 10/07/2011 | Ongoing | 24 Hours | | FT | | 12.00 | Job 030152 - Width Restriction all lanes - Temporary Detour. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 6 | Hot-Spring | 67 | 070 | 4.64 | 4.86 | Alternating North & South Bound | 05/21/2012 | 4 | 7:30am to 5:00pm | 14.00 | FT | | 11.00 | Spot cleaning and painting the Hwy. 67 Ouachita River Bridge by HBM. |
| 6 | Hot-Spring | 67 | 070 | 17.82 | 17.90 | Alternating North & South Bound | 04/16/2012 | On Going | 24 | | FT | | 12.00 | Traffic Controled by Temporary Traffic Control Signal |
| 6 | Pulaski | 67 | 100 | 7.20 | 9.20 | North Bound Outside | 05/14/2012 | 4 DAYS | 9AM-3PM | | FT | | | BRIDGE PARAPET RAIL REPAIR "ACCIDENT" |
| 6 | Pulaski | 67 | 100 | 7.20 | 9.20 | North Bound Outside | 05/14/2012 | 4 DAYS | 9 A.M. TO 3 P.M. | | FT | | 12.00 | BRIDGE PARAPET RAIL REPAIR "ACCIDENT" |
| 3 | Sevier | 70 | 020 | 7.31 | 7.50 | Alternating East & West Bound | 05/15/2012 | 3 | 8a.m. - 4p.m. | 13.00 | FT | | 10.00 | Width restrictions. Bridge Deck Repairs |
| 3 | Pike | 70 | 040 | 5.56 | 5.63 | Alternating East & West Bound | 05/23/2012 | 2 | 7:30am to 5:00pm | 13.00 | FT | | 10.00 | Maintenance repairs to the Hwy. 70 Little Missouri River Bridge by HBM. |
| 6 | Garland | 70 | 090 | 0.23 | 0.60 | Alternating East & West Bound | 05/22/2012 | 2 | 9 A.M. TO 3 P.M. | | FT | | | ROAD SURFACE REPAIR |
| 6 | Garland | 70 | 090 | 9.36 | 10.26 | West Bound Inside | 05/14/2012 | 1 DAY | 9AM-11AM | 15.00 | FT | | 12.00 | SIGN AND POST INSTALLATION |
| 6 | Garland | 70 | 09B | 5.50 | 5.60 | All | 12/12/2011 | Ongoing | 24 Hrs | | FT | 18.00 | | Job No. 061285, Installing Structural Steel Beams and Safety Platforms Will Reduce Vert. Cl. |
| 6 | Prairie | 70 | 160 | 7.40 | 19.90 | Width Restriction Only | 01/04/2012 | Ongoing | Ongoing | | FT | | 8.50 | Job 061187 - Routing to avoid I-40 and Hwy. 70 |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 1 | Monroe | 70 | 170 | 0.00 | 7.73 | Width Restriction Only | 01/04/2012 | On going | 24 Hours | | FT | | 8.50 | |
| 3 | Miller | 71 | 030 | 5.75 | 6.75 | North Bound Inside | 05/07/2012 | 5 | 8am - 6pm | 12.00 | FT | | 9.00 | Job 030378. Inside NB closure to install RCPC. This section is inTexas - For Info Only. |
| 3 | Little-River | 71 | 040 | 0.00 | 0.60 | North Bound | 05/16/2012 | 7 | 8a.m. - 4p.m | 20.00 | FT | | 17.00 | Alternate inside/outside lanes. Bridge Repairs |
| 3 | Little-River | 71 | 040 | 0.00 | 0.60 | South Bound | 05/21/2012 | 2 | 8 a.m. - 4 p.m. | 19.00 | FT | | 16.00 | Bridge Repairs. Width Restriction |
| 4 | Sebastian | 71 | 14B | 1.72 | 2.22 | South Bound Outside | 05/07/2012 | 4 | 7:00 p.m.-6:00 a.m. | 12.00 | FT | | 9.00 | Work in conjunction with SP04-11-033 |
| 4 | Sebastian | 71 | 14B | 1.72 | 2.22 | North Bound Outside | 05/07/2012 | 4 | 7:00 p.m.-6:00 a.m. | 12.00 | FT | | 9.00 | Work in conjunction with SP04-11-033 |
| 6 | Prairie | 86 | 020 | 4.80 | 8.50 | Alternating East & West Bound | 05/22/2012 | 3 | 9 A,M. TO 3 P.M. | | FT | | | Chip sealing operation |
| 8 | Johnson | 109 | 040 | 0.87 | 0.87 | All | 05/20/2012 | 1 | 8 a.m. - 5 p.m. | | FT | | | Union Pacific Railroad crossing closed for track repairs |
| 7 | Dallas | 167 | 070 | 0.00 | 4.40 | Width Restriction Only | 11/08/2010 | Ongoing | 24 Hours | 13.00 | FT | | 10.00 | Width Restriction in All Lanes with Shoulders Closed, Job 070288. |
| 7 | Cleveland | 167 | 080 | 2.11 | 6.90 | Width Restriction Only | 04/21/2011 | Ongoing | 24 Hours | 12.00 | FT | | 9.00 | Box Culvert work. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 5 | Sharp | 167 | 190 | 22.19 | 23.24 | North & South Bound | 05/11/2012 | Ongoing | 24 Hours | 11.00 | FT | | 8.00 | Width Restriction - All Lanes. |
| 6 | Pulaski | 176 | 020 | 0.00 | 3.00 | Alternating East & West Bound | 05/07/2012 | 14 | 7 pm to 6 am | | FT | | | Job 061369 Kiehl Ave. Mill and Inlay |
| 9 | Marion | 178 | 010 | 11.46 | 11.91 | East Bound | 12/05/2011 | 241 | 24 | 10.00 | FT | | 10.00 | Temporary signals will be used for Traffic Control |
| 3 | Hempstead | 195 | 010 | 0.54 | 0.79 | North & South Bound | 08/10/2010 | Ongoing | 24 Hours | | FT | | | Temporary Detour. No change in Horizontal or Vertical Clearance. |
| 3 | Miller | 245 | 010 | 5.00 | 7.70 | South Bound | 07/20/2011 | ongoing | 24 hrs | 12.00 | FT | | 9.00 | Job 030378. SB lanes to use NB lanes with median crossovers. 1 lane each direction. |
| 3 | Miller | 245 | 010 | 6.02 | 6.35 | South Bound Off Ramp | 01/30/2012 | permanent | ongoing | | FT | | | Job 030378 - Ramp to be removed permanently as part of construction project. |
| 3 | Miller | 245 | 010 | 6.02 | 6.35 | South Bound On Ramp | 01/30/2012 | permanent | ongoing | | FT | | | Job 030378 - Ramp will be permantly removed as part of construction project. |
| 4 | Washington | 265 | 020 | 2.69 | 2.80 | North Bound Center | 05/17/2012 | 5 | 9:00 a.m.-3:00 p.m. | 11.00 | FT | | 10.00 | Width Restriction - All Lanes. Installing Pavement Drainage Structure. |
| 4 | Washington | 265 | 020 | 3.60 | 4.50 | North Bound Outside | 12/27/2011 | Ongoing | 24 Hours | 11.00 | FT | | 8.00 | Width Restriction - All Lanes. Center lane will be closed. Box culvert work. |
| 6 | Garland | 270 | 050 | 2.40 | 6.50 | Width Restriction Only | 10/17/2011 | Ongoing | 24 hours | 11.00 | FT | | 11.00 | Detour in place to allow Contractor to extend pipe and box culvert. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 4 | Sebastian | 271 | 010 | 3.00 | 3.20 | North Bound Outside | 05/07/2012 | 4 | 7:00 p.m.-6:00 a.m. | 12.00 | FT | | 9.00 | Work in conjunction with SP04-11-033 |
| 3 | Nevada | 371 | 040 | 2.81 | 3.10 | Alternating North & South Bound | 05/24/2012 | 2 | 7 a.m. - 5 p.m. | 19.00 | FT | | 16.00 | Bridge Deck Repairs. WIDTH RESTRICTION |
| 9 | Madison | 412 | 030 | 5.44 | 7.87 | Width Restriction Only | 05/15/2012 | on going | 24 Hours | 13.00 | FT | | 10.00 | East and West Bound Lanes width restriction |
| 6 | Pulaski | 430 | 210 | 5.34 | 6.53 | North Bound Outside | 05/27/2011 | Ongoing | 24 hours | | FT | | | Job 061244: This lane closure will begin on Friday at 5 am |
| 6 | Pulaski | 430 | 210 | 6.50 | 6.55 | South Bound Off Ramp | 03/23/2012 | ongoing | 24 hours | | FT | 14.00 | | Job 061244: Placement of safety platforms will reduce the vertical clearance. |
| 6 | Pulaski | 430 | 210 | 6.75 | 8.25 | South Bound Outside | 03/14/2011 | ongoing | 24 hours | | FT | | | Job 061244: Placement of concrete barrier walls, 2 lanes of mainlane traffic will be open. |
| 2 | Grant | 530 | 040 | 16.38 | 17.77 | South Bound Inside | 02/29/2012 | 210 | 24 | 16.00 | FT | | 14.00 | Crossover-both directions on Southbound side. |
| 2 | Grant | 530 | 040 | 16.38 | 17.78 | North Bound Inside | 04/27/2012 | 150 | 24 | 14.00 | FT | | 12.00 | Crossover-both directions on Southbound side. |
| 2 | Jefferson | 530 | 050 | 17.78 | 23.77 | North Bound Inside | 04/27/2012 | 150 | 24 | 14.00 | FT | | 12.00 | Crossover-both directions on Southbound side. |
| 2 | Jefferson | 530 | 050 | 17.78 | 23.77 | South Bound Inside | 02/29/2012 | 210 | 24 | 16.00 | FT | | 14.00 | Crossover-both directions on Southbound side. |
Dist. | County | Route | Section | Begin Mile Marker | End Mile Marker | Lane(s) Closed | Begin Date | Approx. Days | Time | Hor. Clr. | Unit | Vert. Clr. | Max. Width Load | Comments................ |
| 4 | Sebastian | 540 | 010 | 4.04 | 4.80 | East & West Bound | 06/13/2011 | Ongoing | 24 hours | 12.00 | FT | | 9.00 | Width Restriction - All Lanes. Barrier wall installed, both shoulder closed. Project 040238 |
| 4 | Washington | 540 | 040 | 42.01 | 43.87 | North Bound Outside | 05/23/2012 | 2 | 7:30am to 5:00pm | 20.00 | FT | | 17.00 | Inspection of the I-540 Blackburn Creek, Deadman Hollow and Hess Creek Bridges by HBM. |
| 9 | Benton | 540 | 050 | 75.75 | 78.25 | South Bound Inside | 01/22/2012 | ONGOING | 8 PM-6:30 AM | | FT | | 12.00 | DITCH PAVING |
| 9 | Benton | 540 | 050 | 81.11 | 83.11 | North Bound Inside | 05/07/2012 | 5 | 8pm - 6am | | FT | | 12.00 | Installing cable in median. |
| 6 | Pulaski | 630 | 210 | 6.82 | 7.03 | All | 04/11/2011 | Ongoing | 24 Hours | | FT | 14.00 | | Job 061244: Placement of safety platforms will reduce the vertical clearance. |
| 6 | Pulaski | 630 | 210 | 6.91 | 7.29 | West Bound | 05/07/2012 | 5 | 9 a.m. to 3 p.m. | | FT | | | Job 061244: Temp. Barrier wall relocation on Westbound I-630. |
| 6 | Pulaski | 630 | 210 | 7.30 | 7.40 | North Bound Outside | 05/07/2012 | 5 | 9 am to 3 pm | | FT | | | Job 061244: On Shackleford 1000 ft north and south of I-630 and Fin. Cent Pkwy |