<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <generator>RSS Builder by B!Soft</generator>
    <title>Web Updates</title>
    <link>http://www.arkansashighways.com/</link>
    <description>updates and added content to Arkansashighways.com web site</description>
    <language>en</language>
    <managingEditor>Webmaster@arkansashighways.com</managingEditor>
    <webMaster>Webmaster@arkansashighways.com</webMaster>
    <copyright>AHTD</copyright>
    <item>
      <title>Improvements to Interstate 30 Require Lane Closure</title>
      <pubDate>Thu, 23 May 2013 15:14:20 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-151.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Crews performing repairs on Interstate 30 will require a lane closure next week in Hot Spring County, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require closing the westbound outside lane of Interstate 30, between mile markers 101 and 103, just east of Malvern. </p>
<p>The closure will be Thursday, May 30th, between 9:00 a.m. and 3:00 p.m., weather permitting. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Bridge Inspection Requires Lane Shift on Highway 70 </title>
      <pubDate>Thu, 23 May 2013 10:49:20 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-150.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[A routine bridge inspection on Highway 70 (East Grand Avenue) will require a lane shift next week in Hot Springs, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require traffic in the westbound lane of Highway 70 (East Grand Avenue) to shift to the shoulder. The bridge is located just east of the Martin Luther King Expressway. </p>
<p>The lane shift will be Wednesday, May 29th, between 9:00 a.m. and 3:00 p.m., weather permitting. Traffic will be controlled using cones and warning signs. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Grand Avenue and Highway 22 (Rogers Avenue) Traffic Restrictions</title>
      <pubDate>Tue, 21 May 2013 16:34:48 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/District%204%20Releases/I-540%20News%20Release%20(5-21-13).pdf</link>
      <category>News</category>
      <description><![CDATA[The Contractor has informed the Arkansas State Highway and Transportation Department District Four Headquarters at Fort Smith of planned work that will impact traffic on Grand Avenue and Highway 22 (Rogers Avenue) in Fort Smith to allow for bridge construction activity on I-540 over these roads. <br/>
<p>Beginning Wednesday, May 22, traffic on Grand Avenue will be restricted to one lane in each direction in the area of I-540 between the hours of 7 p.m. to 6 a.m. with short-term lane closures of less than 30 minutes between midnight and 5 a.m. All traffic lanes will be open by 6 a.m. each day. The work requiring these lane restrictions is expected to be complete by Thursday, May 30. </p>
<p>Beginning Wednesday, May 22, traffic on Highway 22 (Rogers Avenue) will be restricted to one lane in each direction in the area of I-540 between the hours of 7 p.m. to 6 a.m. with short-term lane closures of less than 30 minutes between midnight and 5 a.m. All traffic lanes will be open by 6 a.m. The work requiring these lane restrictions is expected to be complete by Thursday, May 23. </p>
<p>Adjustment of the times of the lane closure may be required due to weather or other unforeseen conditions. Motorists are advised to consider</p>]]></description>
    </item>
    <item>
      <title>CANCELLED - Highway 64 Traffic Pattern Change in Van Buren </title>
      <pubDate>Mon, 20 May 2013 16:35:52 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/District%204%20Releases/I-540%20News%20Release%20Hwy%2064%20Ramp%20Closures%20(5-20-13).pdf</link>
      <category>News</category>
      <description><![CDATA[Work will be rescheduled]]></description>
    </item>
    <item>
      <title>Highway 64 Traffic Pattern Change in Van Buren </title>
      <pubDate>Fri, 17 May 2013 16:39:26 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/District%204%20Releases/I-540%20News%20Release%20A%20(5-8-13)%20B%20Bridge.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>I-540 News</category>
      <description><![CDATA[The Contractor has informed the Arkansas State Highway and Transportation Department District Four Headquarters at Fort Smith of planned changes to traffic patterns on Highway 64 (Alma Highway) in Van Buren associated with the construction on I-540. <br/>
<p>Temporary changes to the traffic patterns are necessary to allow the raising of the bridge deck carrying Highway 64 eastbound traffic over I-540. </p>
<p>All traffic will be moved to the existing westbound lanes of Highway 64 in the area of I-540 to allow the bridge over I-540 in the eastbound direction to be raised. Eastbound traffic will be diverted to the westbound lanes using temporary median crossings. Eastbound and westbound traffic will be separated by a temporary concrete Barrier wall. </p>
<p>The on ramp for eastbound traffic on Highway 64 to I-540 northbound and the southbound off ramp from I-540 to eastbound Highway 64 will be closed to accommodate this work. </p>
<p>Traffic changes will begin after 7 p.m. on May 20 and work is expected to be completed and traffic patterns restored to the existing lanes and ramps within 48 hours. </p>
<p>Motorists are advised to consider alternate routes to reduce congestion in the work zone. </p>]]></description>
    </item>
    <item>
      <title>Improvements To Interstate 530 Require Lane Closure</title>
      <pubDate>Fri, 17 May 2013 12:38:42 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-149.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>I-530 News</category>
      <description><![CDATA[Crews performing pavement repairs on Interstate 530 will require a lane closure starting next week in Pine Bluff, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The repairs will be on the outside southbound lane of Interstate 530 from Exit 41 (Old Warren Road) to Exit 42 (Hazel Street). The work will not interfere with the on ramp of Old Warren Road. However, the Hazel Street off ramp will have traffic barrels and signs clearly marking the correct path for motorists. The Hazel Street off ramp provides access to Jefferson Regional Medical Center. </p>
<p>The closure will begin Wednesday, May 22nd and continue for 2 to 3 weeks, weather permitting. It will last 24 hours each day. Once the outside southbound lane is complete, work will switch to the inside southbound lane. Drivers are encouraged to use an alternate route during rush hours. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Improvements to Highway 270 Require Lane Closures in Jefferson County</title>
      <pubDate>Fri, 17 May 2013 12:38:32 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-148.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Improvements to Highway 270 will require alternating lane closures in Jefferson County, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>Crews will make pavement repairs and resurface the lanes and shoulders of Highway 270. The work will begin at the intersection of Highway 270 and Interstate 530 in White Hall. It will progress west to near Sandy Acres Drive. </p>
<p>The alternating lane closures will be Tuesday, May 21st through Monday, June 3 between 8:00 a.m. and 3:00 p.m. weekdays, weather permitting. Traffic will be controlled by warning signs and flaggers. Drivers should expect short delays and consider an alternate route. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Work on Hot Springs Bathhouse Requires Night Lane Closure on Highway 7 (Central Avenue)</title>
      <pubDate>Fri, 17 May 2013 10:07:00 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-147.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The city of Hot Springs is requesting lane closures on a section of Highway 7 (Central Avenue), according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>On Monday, the city of Hot Springs will replace a transformer at Fordyce Bathhouse located at 369 Central Avenue. The work will require closing the northbound lanes of Central Avenue from just north of Reserve Street to just north of Fordyce Bathhouse. </p>
<p>The closure will be Monday night, May 20th between 8:00 p.m. and 12:00 a.m., weather permitting. Traffic will be controlled by warning signs and flaggers. </p>
<p>For additional information, contact Denny McPhate, Hot Springs Director of Public Works at 501-321-6866. Motorists should exercise caution when approaching and traveling through all highway work zones. </p>
<p>Additional travel related information can be found at <a href="http://www.arkansashighways.com">ArkansasHighways.com</a>. You can also follow us on Twitter <a href="https://twitter.com/AHTD">@AHTD.</a> </p>]]></description>
    </item>
    <item>
      <title>Safety Improvements on Highway 167  </title>
      <pubDate>Thu, 16 May 2013 10:12:10 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-146.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Hwy 167 News</category>
      <description><![CDATA[Safety improvements are underway on Highway 167 near Sheridan, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>State Senator Bobby Pierce of Sheridan asked the AHTD to review this area after hearing concerns from residents in the area. “Drivers were worried about how slick the highway would become after heavy rains and the Highway Department is responding to those concerns,” says Pierce. </p>
<p>Monday, AHTD crews used a milling procedure to increase friction on the roadway surface. The area was about 4 miles north of Sheridan from just north of Circle Court Road to just north of Robertson Road. That’s the equivalent of about one mile. AHTD will continue to monitor the area during heavy rainfall to ensure the highway meets or exceeds safety standards. As a reminder, motorists should exercise caution when approaching and traveling through all highway work zones. </p>
<p>Additional travel related information can be found at <a href="http://www.arkansashighways.com">ArkansasHighways.com</a></p>]]></description>
    </item>
    <item>
      <title>AHTD District 4 Offices Relocating</title>
      <pubDate>Thu, 16 May 2013 09:04:52 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-145.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Arkansas State Highway and Transportation Department District 4 announces the relocation of the District 4 administrative offices to 808 Frontier Road in Barling. <br/>
<p>Administrative offices will open for business at the new location on Friday, May 17. </p>
<p>The phone number for the administrative offices is changing to 479-484-5306. This number may be used to contact the District Engineer, District Construction Engineer, District Maintenance Engineer, and the District Permit Officer. </p>
<p>The administrative offices are relocating to the District Headquarters Complex located at Chaffee Crossing. The Fort Chaffee Redevelopment Authority deeded approximately 40 acres to the Arkansas State Highway Commission in 2002 for the Complex. In addition to the administrative offices, the complex includes a Resident Engineer Office, District Materials Lab, Area Maintenance Headquarters, facilities for several district maintenance and bridge inspection crews, and the office of the Arkansas Highway Police District 3 Commander. </p>
<p>Work to construct the Complex began in fall 2007 and included site work and fencing by Department forces and three contracts to complete the facilities. The total cost for the Headquarters Complex is approximately $13.5 million. </p>
<p>The administrative offices are relocating from facilities at 4019 Towson Avenue in Fort Smith. That location has served as the Headquarters since 1959. District 4 includes Crawford, Franklin, Logan, Polk, Scott, Sebastian, and Washington Counties.</p>]]></description>
    </item>
    <item>
      <title>Highway 549 Opens to Traffic in Texarkana </title>
      <pubDate>Mon, 13 May 2013 15:31:44 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-144.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Highway 549 will open to traffic Wednesday, May 15th in Texarkana, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>On Tuesday, April 30th, a dedication and ribbon cutting ceremony was held for the new location of (Highway 549) (Texarkana Loop), from Arkansas Boulevard to Highway 71 north of Texarkana. </p>
<p>It was hoped that Highway 549 would open to traffic last week. However, poor weather conditions contributed to a delay. Work is now being completed and the highway will open to traffic during the day on Wednesday. </p>
<p>This project is part of the future of the Interstate 49 corridor which will link the Gulf of Mexico with Canada through western Arkansas. </p>]]></description>
    </item>
    <item>
      <title>Improvements to Highway 167 Require Lane Closures in Grant County </title>
      <pubDate>Fri, 10 May 2013 15:13:26 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-143.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Improvements on Highway 167 will require lane closures next week in Grant County, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>Crews will be leveling the driving surface on Highway 167 about 4 miles north of Sheridan. This will require the northbound and southbound outside lanes to be closed. The northbound and southbound inside lanes will remain open. The area affected will be from just north of Circle Court Road to just north of Robertson Road. </p>
<p>The lane closures will be Monday, May 13th between 9:00 a.m. and 3:00 p.m., weather permitting. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones.</p>]]></description>
    </item>
    <item>
      <title>AHTD to Hold Public Involvement Meeting in North Little Rock</title>
      <pubDate>Fri, 10 May 2013 09:05:03 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-142.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Upcoming Events</category>
      <description><![CDATA[The Arkansas State Highway and Transportation Department (AHTD) will hold a Public Involvement Meeting in North Little Rock to discuss plans to replace an overpass on MacArthur Drive (Highway 365) in North Little Rock, according to AHTD officials. <br/>
<p>The bridge is located over Union Pacific Railroad tracks and Parkway Drive, north of Interstate 40. The meeting will be held on Thursday, May 16th, from 4:00 p.m. to 7:00 p.m., at Amboy United Methodist Church, in Tisdale Hall. The church is located at 311 East Military Drive in North Little Rock. </p>
<p>The public is invited to visit anytime during the scheduled hours to view displays, ask questions and offer comments. For more information, contact the Arkansas State Highway and Transportation Department’s Environmental Division at 501-569-2281. </p>]]></description>
    </item>
    <item>
      <title>Improvements to Highway 67 Require Lane Closures in Jacksonville </title>
      <pubDate>Fri, 10 May 2013 09:05:02 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-141.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Improvements on Highway 67 will require lane closures next week in Jacksonville, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>Crews will be sweeping and repairing the roadway surface along Highway 67 in Jacksonville. The work will be performed between the Redmond Road overpass and the LRAFB exit. </p>
<p>The northbound inside lane will be closed Monday, May 13th and Tuesday, May 14th. The southbound inside lane will be closed Thursday, May 16th. All closures will take place between 9:00 a.m. and 3:00 p.m. each day, weather permitting. </p>]]></description>
    </item>
    <item>
      <title>Bridge Repairs Require  Lane Closure on Highway 10 (Cantrell Road) in Little Rock</title>
      <pubDate>Fri, 10 May 2013 09:05:02 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-140.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Bridge deck repairs on Highway 10 (Cantrell Road) in Little Rock will require a continued lane closure next week, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require the westbound outside lane of Cantrell Road to be closed on the railroad bridge (Lincoln Viaduct) located just west of Dillard’s corporate headquarters in Little Rock. The closures will be Monday, May 13th through Thursday, May 16th, between 9:00 a.m. and 3:00 p.m. each day, weather permitting. Traffic will be controlled using cones and warning signs. </p>]]></description>
    </item>
    <item>
      <title>Inspection of Highway 64 Bridge in Fort Smith</title>
      <pubDate>Thu, 9 May 2013 16:17:10 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-137.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Crews performing a routine inspection of the Highway 64 (Garrison Avenue) Bridge over the Arkansas River between downtown Fort Smith and Oklahoma will require a lane closure this Sunday, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The inspection will require an alternating lane closure in the eastbound and westbound lanes this Sunday, May 12th. A lane closure will be in effect between the hours of 7:00 a.m. and 5:00 p.m., weather permitting. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>AHTD Announces Federal Funding for Recreational </title>
      <pubDate>Thu, 9 May 2013 16:17:07 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-138.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The Arkansas State Highway Commission has awarded funding to applicants for the Recreational Trails Program projects in Arkansas. <br/>
<p>“The trails program, which is a very competitive program, is directed toward developing and maintaining trails for recreational purposes throughout the State,” said Arkansas State Highway and Transportation Department (AHTD) Director Scott Bennett. </p>
<p>“We received 45 non-motorized applications requesting more than $3 million. Thirty projects were selected to receive approximately $1.5 million in available funding.” </p>
<p>The AHTD will work with the successful applicants to develop their projects and see them through to completion. </p>]]></description>
    </item>
    <item>
      <title>Highway 64 Traffic Pattern Change in Van Buren </title>
      <pubDate>Wed, 8 May 2013 09:46:44 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/District%204%20Releases/I-540%20News%20Release%20A%20(5-8-13).pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The Contractor has informed the Arkansas State Highway and Transportation Department District Four Headquarters at Fort Smith of planned changes to traffic patterns on Highway 64 (Alma Highway) in Van Buren associated with the construction on I-540. <br/>
<p>Temporary changes to the traffic patterns are necessary to allow the raising of the bridge deck carrying Highway 64 westbound traffic over I-540. </p>
<p>All traffic will be moved to the existing eastbound lanes of Highway 64 in the area of I-540 to allow the bridge over I-540 in the westbound direction to be raised. Westbound traffic will be diverted to the eastbound lanes using temporary median crossings. Eastbound and westbound traffic will be separated by a temporary concrete Barrier wall. </p>
<p>The on ramp for westbound traffic on Highway 64 to I-540 southbound and the northbound off ramp from I-540 to westbound Highway 64 will be closed to accommodate this work. </p>
<p>Traffic changes will begin after 7 p.m. on May 9 and work is expected to be completed and traffic patterns restored to the existing lanes and ramps within 48 hours. </p>
<p>Motorists are advised to consider alternate routes to reduce congestion in the work zone. </p>]]></description>
    </item>
    <item>
      <title>I-540 Work to Impact Traffic on Highway 162</title>
      <pubDate>Wed, 8 May 2013 09:46:43 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/District%204%20Releases/I-540%20News%20Release%20B%20(5-8-13).pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The Contractor has informed the Arkansas State Highway and Transportation Department District Four Headquarters at Fort Smith of planned work that will impact traffic on Highway 162 (Kibler Road) in Van Buren. <br/>
<p>Beginning Friday, May 10, traffic will be restricted on Highway 162 in the area of I-540 between the hours of 6 p.m. to 6 a.m. Traffic will be restricted to movement in one direction at a time and will be closed for up to 30 minutes at a time by flaggers stationed in advance of the work area. All traffic lanes will be open from 6 a.m. to 6 p.m. </p>
<p>Work is expected to be complete by 6 a.m. on Friday, May 17. </p>
<p>The restrictions are necessary to allow removal of the deck from the bridge that normally carries I-540 traffic over Highway 162. </p>
<p>Motorists are advised to consider alternate routes to reduce congestion in the work zone. </p>
<p>In November, 2012, the Arkansas Highway Commission awarded a contract, in the amount of $78.8 million, to Kiewit Infrastructure South Company of Fort Worth, Texas. Work on the project is expected to be complete in mid-2014.</p>
<p>&nbsp;Motorists are urged to use care and think ahead when traveling through the work zone. Motorists should Obey the Posted Speed Limits and Other Regulatory Signing; Maintain a Steady Speed; Leave Room Between Vehicles; Be Aware of Road Conditions; and Anticipate the Need to Stop or Reduce Speed Substantially. </p>
<p>Up-to-date information on lane closures on this and other projects in the state is available at www.arkansashighways.com. </p>]]></description>
    </item>
    <item>
      <title>Overnight Construction Requires a New Detour at I-430/630 Interchange</title>
      <pubDate>Tue, 7 May 2013 16:01:52 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-136.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Big Rock Interchange</category>
      <description><![CDATA[Continued overnight construction will require a detour starting again this week at the Interstate 430/630 (Big Rock) Interchange, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>All westbound drivers on Interstate 630 wanting to go south on Interstate 430 will exit using the northwest cloverleaf loop. However, rather than entering I-430 south at that point, drivers will be detoured to the Shackleford/Hermitage Road intersection. Motorists will then be directed southbound on Shackleford Road to Interstate 430 South. In addition, the outside southbound lane of Interstate 430 will be closed through the Big Rock interchange. This is the same detour that was used May 1st through May 3rd. For more information, see the attached map of the detour area. </p>
<p>The detour and lane closure will be necessary as crews paint steel girders above the affected travel lanes. The detour and lane closure will be Wednesday night, May 8th through Friday morning, May 24h. Weather permitting, all scheduled closures will be between 9:00 p.m. and 5:00 a.m., except for Friday and Saturday nights. </p>
<p>This is part of a series of month long construction plans that will affect traffic flow. “We urge motorists to plan ahead and use caution, especially if you are driving Interstate 630 westbound or Interstate 430 southbound during the weekday overnight hours,” says AHTD Director Scott Bennett.</p>]]></description>
    </item>
    <item>
      <title>Request for Letters of Interest for a Talent Acquisition System available until 5/31/13</title>
      <pubDate>Mon, 6 May 2013 12:38:19 -0500</pubDate>
      <link>http://www.arkansashighways.com/consultant_services/advertisements/advertisements.aspx</link>
      <category>Letters of Interest</category>
      <description><![CDATA[REQUEST FOR LETTERS OF INTEREST <br/>
<p>Notice is hereby given that the Arkansas State Highway and Transportation Department is seeking letters of interest from qualified software companies for the development and implementation of a Talent Acquisition System. </p>
<p>The work will generally consist of transforming a manual application and hiring system to an automated, end to end talent acquisition system. This platform will be integrated with the Department’s existing human resource information system. </p>
<p>A letter of interest, together with primary contact information and your firm’s qualifications and experience shall be submitted to: </p>
<p>Crystal Woods <br/>Division Head of Human Resources <br/>Arkansas State Highway and Transportation Department <br/>P.O. Box 2261<br/>Little Rock, AR 72203-2261 <br/>or 10324 Interstate 30, Little Rock, AR 72209 </p>
<p>Five sets of paper responses and one copy in pdf format on Compact Disc (CD) must be received no later than 4:00 p.m. (CDT) on Friday, May 31, 2013. Any responses received after this deadline will not be considered. </p>
<p>The selection of the firm will be based on responses relating to experience, availability, and qualifications of staff. </p>
<p>After a review of all letters of interest received, selected firms will be furnished a scope of work and requested to submit proposals for accomplishing the work.</p>]]></description>
    </item>
    <item>
      <title>Weather Delays Opening of Highway 549 to Traffic in Texarkana </title>
      <pubDate>Fri, 3 May 2013 13:34:26 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-135.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Poor weather conditions will delay the opening of Highway 549 to traffic in Texarkana, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>On Tuesday, April 30th, a dedication and ribbon cutting ceremony was held for the new location of the Texarkana Loop (Highway 549), from Arkansas Boulevard to Highway 71 north of Texarkana. </p>
<p>Highway 549 was scheduled to open to traffic next week. However, due to recent rainy conditions, the contractor has been unable to complete all the work as scheduled. AHTD officials hope to have Highway 549 open the week of May 13th. We will provide additional information when an exact date has been set. </p>
<p>This project is part of the future of the Interstate 49 corridor which will link the Gulf of Mexico with Canada through western Arkansas. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Training Exercise to Close Portion of Highway 96 on the Evening of May 7</title>
      <pubDate>Fri, 3 May 2013 10:32:59 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/District%204%20Releases/050313_DOE_release.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[State Highway 96 will be closed to traffic from Fort Smith Blvd. to the Fort Chaffee South Boundary Road on May 7 between 8:00 pm and midnight. The Department of Energy’s Office of Secure Transportation (OST) said the closure will allow OST to conduct training exercises. <br/>
<p>Questions about the closure should be addressed to the TRACOM Exercise Control Center (ECC) at (479) 709-5302 /5303. </p>]]></description>
    </item>
    <item>
      <title>Inspection Requires Lane Closures on Highway 23 </title>
      <pubDate>Fri, 3 May 2013 10:32:58 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-134.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[A routine inspection on the Highway 23 Arkansas River Bridge will require lane closures, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require alternating lane closures on the Highway 23, Arkansas River Bridge between Ozark and Webb City. The closures will be Tuesday, May 7th through Wednesday, May 8th between the hours of 9:00 a.m. and 3:00 p.m. each day, weather permitting. Traffic will be controlled using warning signs, cones, and flaggers. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Inspection Requires Lane Closures on Highway 64 </title>
      <pubDate>Fri, 3 May 2013 10:32:55 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-133.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[A routine inspection on the Highway 64 (Midland Boulevard) Arkansas River Bridge will require lane closures, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require alternating lane closures on the Highway 64, Arkansas River Bridge between Fort Smith and Van Buren. The closure will be Sunday, May 5th between 7:00 a.m. and 5:00 p.m., weather permitting. Traffic will be controlled using warning signs and cones. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Improvements to Interstate 630 Require Lane Closures</title>
      <pubDate>Fri, 3 May 2013 10:32:55 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-132.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Improvements to Interstate 630 will require lane closures next week in Little Rock, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>Crews will be repairing the shoulders and testing the pavement on Interstate 630 between Chester Street and Fairpark Boulevard. </p>
<p>The westbound outside lane will be closed in that area on Monday, May 6th. The westbound inside lane will be shut down on Tuesday, May 7th. The eastbound inside lane will be closed on Wednesday, May 8th. All work will be performed between 9:00 a.m. and 3:00 p.m., weather permitting. </p>
<p>Traffic will be controlled using warning signs and cones/barrels. Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Overnight Construction Requires a New Detour at I-430/630 Interchange</title>
      <pubDate>Fri, 3 May 2013 10:32:54 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-131.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Big Rock Interchange</category>
      <description><![CDATA[Overnight construction will require a new detour and lane closure at the Interstate 430/630 (Big Rock) Interchange, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>All southbound drivers on Interstate 430 wanting to go west on Financial Centre Parkway or east on Interstate 630 will be detoured to the Shackleford Road overpass (Exit 5). Drivers wanting to access Financial Centre Parkway will turn right on Shackleford Road. They can then turn left on Hermitage or left on Financial Centre Parkway. Motorists wanting to access Interstate 630 will turn left after exiting, cross the Shackleford Road overpass and enter Interstate 430 northbound to access Interstate 630. In addition, the outside southbound lane of Interstate 430 will be closed through the Big Rock interchange. For more information, see the attached map of the detour area. </p>
<p>The detour and lane closure will be necessary as crews paint steel girders above the affected travel lanes. The detour and lane closure will be Sunday night, May 5th through Friday morning, May 10th between 9:00 p.m. and 5:00 a.m. each night, weather permitting. </p>
<p>This is the 2nd part of month long construction plans that will affect traffic flow. “We urge motorists to plan ahead and use caution, especially if you are driving Interstate 630 westbound or Interstate 430 southbound during the weekday overnight hours,” says AHTD Director Scott Bennett. There will be additional detours and lane closures throughout the month of May. AHTD will provide updates as work schedules are finalized. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Maintenance on Martin Luther King Expressway Median Wall Requires Lane Closures in Hot Springs </title>
      <pubDate>Fri, 3 May 2013 10:32:54 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-130.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Maintenance work on portions of Highways 70 and 270 (Martin Luther King Expressway) will require lane closures this month in Hot Springs, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work on the median wall will require portions of the westbound inside lane of the Martin Luther King Expressway to be closed. The work will progress from east to west along the expressway. The closures will begin Tuesday, May 7th and continue through Friday, May 17th, between 9:00 a.m. and 3:00 p.m. weekdays, weather permitting. </p>
<p>Maintenance to the eastbound inside lane will begin Thursday, May 16th and continue through the end of the month. Work will progress from west to east along the expressway and will only be performed between 9:00 a.m. and 3:00 p.m. weekdays, weather permitting. </p>
<p>Crews will be doing routine maintenance including general cleaning, weed eating, and drain clearing along the median wall. This work can’t be accomplished under normal traffic conditions due to the lack of space between traffic lanes and the median wall. Traffic will be controlled using warning signs and cones/barrels. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Bridge Repairs Require Continued Lane Closure On Highway 10 in Little Rock</title>
      <pubDate>Fri, 3 May 2013 10:32:53 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-129.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Bridge deck repairs on Highway 10 (Cantrell Road) in Little Rock will require a continued lane closure next week, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require the westbound outside lane of Cantrell Road to be closed on the railroad bridge (Lincoln Viaduct) located just west of Dillard’s corporate headquarters in Little Rock. The closures will be Monday, May 6th through Thursday, May 9th, between 9:00 a.m. and 3:00 p.m. each day, weather permitting. Traffic will be controlled using cones and warning signs. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Arkansas Dramatically Improves its Ranking Among Bicycle Friendly States</title>
      <pubDate>Wed, 1 May 2013 09:34:46 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-128.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Today is the first day of National Bike Month and The League of American Bicyclists is releasing its latest rankings among bicycle friendly states. The results show that Arkansas is making great strides in improving its accommodation of cyclists. <br/>
<p>Arkansas moved up 13 spots in the survey, the 2nd largest jump in the entire country. Arkansas is now number 37 among the 50 states. Just last year, Arkansas was at the bottom of the list. </p>
<p>“The bicycling culture in Arkansas has grown more popular in recent years and we are responding,” says Arkansas State Highway and Transportation Department Director Scott Bennett. “The results serve as an affirmation that our statewide efforts are making a real difference in The Natural State.” </p>
<p>Arkansas’ latest ranking was based on a number of key indicators, including infrastructure and funding that provide bicycle facilities; education and programs that promote cycling; and passage and enforcement of bicycle-friendly laws that make it safe and comfortable for people of all ages to ride a bike. </p>
<p>“Arkansas has made great strides toward becoming a more bicycle friendly state, and we need to continue to build on this momentum. Although our resources are extremely limited, we hope the Arkansas State Highway and Transportation Department can continue to play a role in this progress toward providing a convenient and safe infrastructure for bicyclists in Arkansas," says Bennett. </p>
<p>In coordination with the Arkansas Department of Parks and Tourism, the next step is to update the State Bicycle and Pedestrian Plan to develop a blueprint for how state agencies, local governments and other organizations can work to improve the environment for both cyclists and pedestrians. </p>]]></description>
    </item>
    <item>
      <title>AHTD to Hold Design Public Hearing in Dover</title>
      <pubDate>Wed, 1 May 2013 09:34:45 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-127.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Upcoming Events</category>
      <description><![CDATA[The Arkansas State Highway and Transportation Department (AHTD) will hold a Design Public Hearing in Dover to discuss plans to widen Highway 7 in Dover, according to AHTD officials. <br/>
<p>The meeting will be held on Thursday, May 9th, from 4:00 p.m. to 7:00 p.m., at the Dover Middle School Cafeteria, in the Fine Arts Building. It’s located at 170 College Street in Dover. </p>
<p>A copy of the design plans is available for public inspection at the Arkansas State Highway and Transportation Department’s District Eight Office, 372 Aspen Lane, I-40 exit 81 in Russellville. </p>
<p>The public is invited to visit anytime during the scheduled hours to view displays, ask questions and offer comments. For more information, contact the Arkansas State Highway and Transportation Department’s Environmental Division at 501-569-2281. </p>]]></description>
    </item>
    <item>
      <title>AHTD to Hold Design Public Hearing in Little Rock</title>
      <pubDate>Wed, 1 May 2013 09:34:45 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-126.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Upcoming Events</category>
      <description><![CDATA[The Arkansas State Highway and Transportation Department (AHTD) will hold a Public Involvement Meeting in Little Rock to discuss plans for replacing the Union Pacific Railroad overpass on Roosevelt Road (Highway 70). The bridge is located near the State Fairgrounds, according to AHTD officials. <br/>
<p>The meeting will be held on Tuesday, May 7th, from 4:00 p.m. to 7:00 p.m., at Gospel Temple Baptist Church, in the Fellowship Hall. The church is located at 2420 Wolfe Street in Little Rock. The public is invited to visit anytime during the scheduled hours to view displays, ask questions and offer comments. </p>
<p>For more information, contact the Arkansas State Highway and Transportation Department’s Environmental Division at 501-569-2281. </p>]]></description>
    </item>
    <item>
      <title>Overnight Construction Will Create Traffic Changes At Interstate 430/630 Interchange In Little Rock</title>
      <pubDate>Tue, 30 Apr 2013 16:44:45 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-125.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Big Rock Interchange</category>
      <description><![CDATA[Beginning Wednesday night, overnight construction will create frequent changes in traffic flow at the Interstate 430/630 (Big Rock) Interchange, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>All westbound drivers on Interstate 630 wanting to go south on Interstate 430 will exit using the northwest cloverleaf loop. However, rather than entering I-430 south at that point, drivers will be detoured to the Shackleford/Hermitage Road intersection. Motorists will then be directed southbound on Shackleford Road to Interstate 430 South. For more information, see the attached map of the detour area. In addition, the outside southbound lane of Interstate 430 will be closed through the Big Rock interchange. </p>
<p>The detour and lane closure will be necessary as crews paint steel girders above the affected travel lanes. The detour and lane closure will be Wednesday night, May 1st through Friday morning, May 3rd between 9:00 p.m. and 5:00 a.m. each night, weather permitting. </p>
<p>This is only the first of a series of month long construction plans that will affect traffic flow. “We urge motorists to plan ahead and use caution, especially if you are driving Interstate 630 westbound or Interstate 430 southbound during the weekday overnight hours,” says AHTD Director Scott Bennett. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Bridge Repairs On Interstate 430 Require Lane Closure On Arkansas River Bridge </title>
      <pubDate>Tue, 30 Apr 2013 10:01:29 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-124.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Bridge repairs on Interstate 430 will require a temporary lane closure on the Arkansas River Bridge, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>Crews will be repairing river navigational lights. The work will require the southbound outside lane to be closed on the bridge. Northbound traffic will not be affected. </p>
<p>The lane closure will be Thursday, May 2nd between 9:00 a.m. and 3:00 p.m., weather permitting. Traffic will be controlled using warning signs and barrels. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Bridge Repairs On Highway 67 Require Lane Closure</title>
      <pubDate>Tue, 30 Apr 2013 10:01:27 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-123.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Bridge repairs on Highway 67 will require a temporary lane closure in Jacksonville, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>Crews will be making deck repairs on the Redmond Road overpass in Jacksonville. The work will require the southbound outside lane to be closed on and just north of the overpass. Northbound traffic will not be affected. </p>
<p>The lane closure will be Thursday, May 2nd between 9:00 a.m. and 3:00 p.m., weather permitting. Traffic will be controlled using warning signs and barrels. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Improvements to Interstate 630 Require Lane Closure  in Little Rock </title>
      <pubDate>Mon, 29 Apr 2013 16:28:09 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-122.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Pavement repairs on Interstate 630 will require a temporary lane closure in Little Rock, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require the eastbound outside lane to be closed just before the Interstate 30 westbound exit. The lane closure will be Wednesday, May 1st between 9:00 a.m. and 3:00 p.m., weather permitting. Traffic will be controlled using warning signs and barrels. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Improvements to Interstate 530 Require Lane Closure in Pine Bluff</title>
      <pubDate>Fri, 26 Apr 2013 14:58:32 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-118.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Repair work on Interstate 530 will require a lane closure next week in Pine Bluff, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require the southbound outside lane of Interstate 530 to be closed near Exit 43 (Highway 63/S. Olive Street). Drivers will still have access to Exit 43. </p>
<p>The closure will begin Monday, April 29th at 9:00 a.m. and conclude by Friday, May 3rd at 3:00 p.m., weather permitting. Traffic will be controlled using warning signs and barrels. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones.</p>]]></description>
    </item>
    <item>
      <title>Routine Maintenance Requires Lane Closures on Highway 183 in Saline County</title>
      <pubDate>Fri, 26 Apr 2013 14:02:59 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-117.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Routine maintenance will require lane closures on Highway 183 (S. Reynolds Road) next week in Saline County, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>Crews will be taking core samples of Highway 183 near the railroad overpass just north of Tom Road in Bauxite. The alternating lane closures will affect both northbound and southbound lanes. Traffic will be controlled using warning signs and flaggers. </p>
<p>The lane closures will be Wednesday, May 1st and Thursday, May 2nd between 9:00 a.m. and 3:00 p.m., weather permitting. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones.</p>]]></description>
    </item>
    <item>
      <title>News Event Notification - Plaque Dedication</title>
      <pubDate>Fri, 26 Apr 2013 13:52:47 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-119.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News Conference</category>
      <description><![CDATA[WHAT: Memorial service and plaque dedication event. <br/>
<p>WHO: The family and friends of Sharren Richards, and Arkansas State Highway and Transportation Department officials. </p>
<p>WHEN: Wednesday, May 1 at 1:00 p.m. </p>
<p>WHERE: The event will take place at the Van Buren/Fort Smith Welcome Center located at 2915 Interstate 40 on the eastbound side near Van Buren. </p>
<p>WHY: One year ago on this date, Sharren “Storm Wolf” Richards was tragically murdered while she was performing her job with the Arkansas State Highway and Transportation Department at the Welcome Center. Sharren is gone, but not forgotten by her many friends, family members and co-workers. On this day a permanent marker in her honor will be placed among the flowers that she helped nurture. </p>
<p>CONTACT: Glenn Bolick 501-569-2572 work 501-944-1552 cell or at glenn.bolick@arkansashighways.com </p>]]></description>
    </item>
    <item>
      <title>Bridge Painting Requires Nightly Lane Closure in Big Rock Interchange</title>
      <pubDate>Fri, 26 Apr 2013 11:02:15 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-121.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Big Rock Interchange</category>
      <description><![CDATA[Bridge painting will require overnight lane closures at the Interstate 430/630 (Big Rock) Interchange, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The southbound outside lane on Interstate 430 will be closed as crews paint steel girders on the bridges above the travel lanes. The lane closures will be Sunday night, April 28th through Friday morning, May 3rd between 9:00 p.m. and 5:00 a.m. each night, weather permitting. No detours will be used. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones.</p>]]></description>
    </item>
    <item>
      <title>News Event - Hwy 549 Dedication</title>
      <pubDate>Fri, 26 Apr 2013 10:59:54 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-120.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News Conference</category>
      <description><![CDATA[WHAT: Dedication and ribbon cutting event. <br/>
<p>WHO: Arkansas State Highway and Transportation Department officials, Rep. (and former Highway Commissioner) Prissy Hickerson and local officials. </p>
<p>WHEN: Tuesday, April 30 at 10:30 a.m. </p>
<p>WHERE: The event will take place at the new I-30 and Highway 549 Interchange. Attendees are being instructed to enter the site from I-30 eastbound. Highway Police will direct people to the site. </p>
<p>NOTICE TO ALL MEDIA: You can enter Highway 549 north at the Arkansas Boulevard Intersection. Highway Police will allow you entry and direct you to the dedication site. WHY: Completion of the new location of the Texarkana Loop (Highway 549) from Arkansas Boulevard to Highway 71 north of Texarkana. Four separate construction projectsand additional costs represent a total investment of nearly $150 million. </p>
<p>CONTACT: Glenn Bolick 501-569-2572 work 501-944-1552 cell</p>]]></description>
    </item>
    <item>
      <title>Routine Maintenance Requires Lane Closures on Highway 10 (Cantrell Road) in Little Rock</title>
      <pubDate>Fri, 26 Apr 2013 10:22:41 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-116.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Routine maintenance will require lane closures on Highway 10 (Cantrell Road) next week in Little Rock, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>Crews will be taking core samples of Highway 10 from Sam Peck Road to Pleasant Valley Road. The alternating lane closures will affect both eastbound and westbound outside lanes. </p>
<p>The lane closures will be Tuesday, April 30th and Wednesday, May 1st between 9:00 a.m. and 3:00 p.m., weather permitting. Traffic will be controlled using cones and warning signs. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones.</p>]]></description>
    </item>
    <item>
      <title>Bridge Repairs Requires Lane Closure on Hwy 10 (Cantrell Road) in Little Rock</title>
      <pubDate>Fri, 26 Apr 2013 10:08:30 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-115.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Bridge deck repairs on Highway 10 (Cantrell Road) in Little Rock will require a lane closure next week, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require the westbound outside lane of Cantrell Road to be closed on the railroad bridge (Lincoln Viaduct) located just west of Dillard’s corporate headquarters in Little Rock. The closures will be Monday, April 29th through Thursday, May 2nd, between 9:00 a.m. and 3:00 p.m. each day, weather permitting. </p>
<p>Traffic will be controlled using cones and warning signs. Motorists should exercise caution when approaching and traveling through all highway work zones.</p>]]></description>
    </item>
    <item>
      <title>Training Exercise to close Portion of Hwy. 96 on the Evening of April 30th</title>
      <pubDate>Thu, 25 Apr 2013 09:46:04 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/District%204%20Releases/042513_DOE_release.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Training Exercise to Close Portion of Highway 96 on the Evening of April 30 <br/>
<p>State Highway 96 will be closed to traffic from Fort Smith Blvd. to the Fort Chaffee South Boundary Road on April 30 between 8:00 pm and midnight. The Department of Energy’s Office of Secure Transportation (OST) said the closure will allow OST to conduct training exercises. </p>
<p>Questions about the closure should be addressed to the TRACOM Exercise Control Center (ECC) at(479) 709-5302 /5303. The same section of the road will be closed for the same time period on May 7.</p>]]></description>
    </item>
    <item>
      <title>Bid Opening News Releases from April 17th Letting</title>
      <pubDate>Wed, 24 Apr 2013 08:16:04 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/news_archives_2013.aspx</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[58 Jobs were let to contract on April 17th, 2013, for a total amount of $160,859,107.93]]></description>
    </item>
    <item>
      <title>Repairs to Scott Hamilton Overpass on I-30 in Little Rock Complete</title>
      <pubDate>Fri, 19 Apr 2013 19:00:10 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-114.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Bridge repair that required the temporary closure of the Scott Hamilton overpass on Interstate 30 in Little Rock has been completed, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>Traffic on the bridge is now fully open in both directions. Eastbound lanes on Interstate 30 that were closed during the repair process are open too. Westbound traffic was not affected. </p>
<p>The Scott Hamilton bridge is approximately 50 years old and 260 feet in length. It carries about 9,500 vehicles per day. </p>]]></description>
    </item>
    <item>
      <title>Bridge Painting Requires Nightly Lane Closure in Big Rock Interchange</title>
      <pubDate>Fri, 19 Apr 2013 15:53:27 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-113.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Big Rock Interchange</category>
      <description><![CDATA[Bridge painting will require overnight lane closures at the Interstate 430/630 (Big Rock) Interchange, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>Northbound and southbound inside lanes on Interstate 430 will be closed as crews paint steel girders on the bridges above the travel lanes. The lane closures will be Sunday night, April 21st through Friday morning, April 26th between 9:00 p.m. and 5:00 a.m. each night, weather permitting. No detours will be used. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Bridge Repair Requires Closure of Scott Hamilton Overpass on I-30 in Little Rock</title>
      <pubDate>Fri, 19 Apr 2013 14:48:01 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-112.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Bridge repair requires the temporary closure of the Scott Hamilton overpass on Interstate 30 in Little Rock, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The bridge is temporarily closed as a crew makes repairs. Travel on Interstate 30 eastbound is narrowed to one lane beneath the overpass. Westbound traffic is not affected. Repairs are expected to be complete by the end of the day. </p>
<p>The Scott Hamilton bridge is approximately 50 years old and 260 feet in length. It carries about 9,500 vehicles per day. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones.</p>]]></description>
    </item>
    <item>
      <title>Improvements to Highway 5 (Stagecoach Road) Require Lane Closures in Little Rock </title>
      <pubDate>Fri, 19 Apr 2013 09:49:05 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-110.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Improvements on Highway 5 (Stagecoach Road) will require lane closures next week in Little Rock, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>Crews will be leveling the driving surface on Highway 5 (Stagecoach Road) between Highway 338 (Baseline Road) and Crystal Valley Road. Repairs will also be performed on Highway 5 just north of Otter Creek Parkway. </p>
<p>The alternating lane closures will affect both northbound and southbound traffic. The areas affected are two lanes in each direction, so at least one lane of traffic will be open at all times. </p>
<p>The lane closures will be Monday, April 22nd and Tuesday, April 23rd between 9:00 a.m. and 3:00 p.m., weather permitting. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones.</p>]]></description>
    </item>
    <item>
      <title>Improvements to Highway 270 Require Lane Closure</title>
      <pubDate>Fri, 19 Apr 2013 09:40:20 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-111.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Improvements on Highway 270 will require a lane closure next week in Grant County, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>Crews will be repairing a drainage culvert on Highway 270 just east of Highway 291 near Prattsville. The work will require the eastbound lane to be closed Tuesday, April 23rd and Wednesday, April 24th between 8:00 a.m. and 4:00 p.m. each day, weather permitting. Traffic will be controlled using flaggers and warning signs. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Public Involvement - Hwy. 290 - Ouachita River Bridge (Hwy. 7)</title>
      <pubDate>Thu, 18 Apr 2013 10:49:22 -0500</pubDate>
      <link>http://www.arkansashighways.com/public_meetings/2013/060432/060432.aspx</link>
      <author>info@arkansashighways.com</author>
      <category>Upcoming Events</category>
      <description><![CDATA[Added the Project Map and Comment form for tonights meeting.]]></description>
    </item>
    <item>
      <title>Designation of Highway 549 will Require New Exit Numbers in Texarkana </title>
      <pubDate>Wed, 17 Apr 2013 15:58:21 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-109.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The designation of State Highway 549 will require new exit numbers in Texarkana, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>A large portion of existing Highway 245 will be re-designated as State Highway 549. Highway 549 will go from Doddridge to Texarkana where it will maintain a path along existing Highway 245 to Arkansas Boulevard. From there, Highway 549 will continue northeast on a new location and cross Interstate 30. It will then turn back to the west to intersect with existing Highway 71 just north of Texarkana. </p>
<p>The exit changes shown on the attached map will go into effect when Highway 549 is opened within a month. An additional media release will be sent when the opening date is scheduled. </p>
<p>This project is part of the future Interstate 49 corridor which help link the Gulf of Mexico with Canada through western Arkansas. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones.</p>]]></description>
    </item>
    <item>
      <title>Overhead Sign Work Will Require Temporary Overnight Lane Closures on Interstate 30 in Miller County</title>
      <pubDate>Mon, 15 Apr 2013 15:45:46 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-108.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Crews working on overhead signs on Interstate 30 will require temporary overnight lane closures this week in Miller County, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will begin Tuesday night, April 16th and conclude Friday morning, April 19th. The work will only take place between the hours of 11:00 p.m. and 5:00 a.m., weather permitting. </p>
<p>The area affected will be on Interstate 30 just west of Highway 245 (Hickerson Freeway) and just east of the Highway 549 Interchange (under construction) east of Texarkana. The project will require the eastbound lanes to be closed Tuesday and Wednesday nights. Westbound lanes will be closed Thursday night. All closures will be for short intervals not to exceed 10 minutes. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Bridge Painting Requires Nightly Lane Closure in Big Rock Interchange</title>
      <pubDate>Fri, 12 Apr 2013 17:35:50 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-107.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Northbound traffic on I-430 in the Big Rock Interchange will be reduced to one lane for several nights so the contractor can paint steel girders of the flyover bridges, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>Lane closures will be Sunday, April 14th through Thursday, April 18th between 9:00 p.m. and 5:00 a.m. each night, weather permitting. Only one lane will be closed and one will remain open to traffic. No detours will be used. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones.</p>]]></description>
    </item>
    <item>
      <title>Notice to Media - Commission Meeting &amp; Bid Letting</title>
      <pubDate>Fri, 12 Apr 2013 12:12:46 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-106.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Commission Meeting</category>
      <description><![CDATA[In compliance with Act 93 of 1967, you are hereby notified that members of the Arkansas State Highway Commission will meet on the following dates and times to consider any business that may be brought before the Commission. Unless otherwise stated, meetings will be held at the AHTD Central Office Building, 10324 Interstate 30, in Little Rock. <br/>
<p>Wednesday, April 17, 2013 </p>
<p>9:00 a.m. Business Meeting </p>
<p>10:30 a.m. Opening bids on 29 projects totaling $92 million </p>
<p>11:30 a.m. Working Lunch </p>
<p>2:00 p.m. Opening bids on 30 projects totaling $75 million</p>]]></description>
    </item>
    <item>
      <title>Improvements to Highway 343 Requires Lane Closure in Arkansas County</title>
      <pubDate>Fri, 12 Apr 2013 08:59:33 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-105.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Improvements on Highway 343 will require a lane closure next week in Arkansas County, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require one lane of traffic to be closed on Highway 343 just south of the Highway 11 junction, between the towns of DeWitt and Reydell. The work will begin Tuesday, April 16th at 10:00 a.m. It will be complete by Thursday, April 18th at 4:00 p.m., weather permitting. </p>
<p>Crews will remove and replace drainage culverts and then repair the affected roadway, shoulders and slopes.</p>]]></description>
    </item>
    <item>
      <title>Work on Hot Springs Bathhouse Requires Overnight Closure of Through Traffic on Hwy 7 (Central Avenue)</title>
      <pubDate>Fri, 12 Apr 2013 10:10:22 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-104.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The city of Hot Springs is requesting an overnight “through traffic” closure next week on a section of Highway 7 (Central Avenue), according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>A large crane being used at the Fordyce Bathhouse will require all lanes of traffic to be closed to through traffic on Central Avenue between Reserve Street and the fountain located at the intersection of Whittington and Central Avenues. Local access to businesses within the affected area will be allowed as safety permits. The closure will be Tuesday, April 16th at 8:00 p.m. through Wednesday, April 17th at 6:00 a.m., weather permitting. </p>
<p>Northbound traffic will be detoured using Exchange Street. Southbound traffic will be diverted using Whittington Avenue and West Mountain Drive. Trucks will be detoured to Highway 7 Spur. </p>
<p>For additional information, contact Denny McPhate, Hot Springs Director of Public Works at 501-321-6866. </p>]]></description>
    </item>
    <item>
      <title>Bridge Repairs Require Lane Closure on Cantrell Road in Little Rock</title>
      <pubDate>Fri, 12 Apr 2013 07:35:28 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-103.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Bridge deck repairs on Cantrell Road (Highway 10) in Little Rock will require a lane closure next week, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require the westbound outside lane of Cantrell Road to be closed on the railroad bridge (Lincoln Viaduct) located just west of Dillard’s corporate headquarters in Little Rock. The closures will be Monday, April 15th through Thursday, April 18th, between 9:00 a.m. and 3:00 p.m. each day, weather permitting. </p>
<p>Traffic will be controlled using cones and warning signs. Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>Bridge Inspection Requires Lane Closures on Roosevelt Road in Little Rock</title>
      <pubDate>Fri, 12 Apr 2013 07:27:27 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-102.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[A routine bridge inspection on Roosevelt Road (Highway 70) in Little Rock will require lane closures next week, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will limit traffic to one lane in each direction on the railroad overpass located near the State Fairgrounds in Little Rock. Traffic will be controlled using cones and warning signs. The closures will be Monday, April 15th through Tuesday, April 16th, between 9:00 a.m. and 3:00 p.m. each day, weather permitting. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. </p>]]></description>
    </item>
    <item>
      <title>AHTD to Hold Public Involvement Meeting in Little Rock</title>
      <pubDate>Fri, 12 Apr 2013 07:22:27 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-101.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The Arkansas State Highway and Transportation Department (AHTD) will hold a Public Involvement Meeting in Little Rock to discuss preliminary findings from the Highway 10 (Cantrell Road) Improvements Study from Pleasant Valley Road to Ferndale Cutoff Road, according to AHTD officials. <br/>
<p>The meeting will be held on Thursday, April 18th, from 4:00 p.m. to 7:00 p.m., at the Don R. Roberts Elementary School Cafeteria. The school is located at 16601 LaMarche Drive in Little Rock. The public is invited to visit anytime during the scheduled hours to view displays, ask questions and offer comments. <br/></p>
<p>For more information, contact the Arkansas State Highway and Transportation Department’s Environmental Division at 501-569-2281. </p>]]></description>
    </item>
    <item>
      <title>AHTD to Hold Public Involvement Meeting in Hot Springs</title>
      <pubDate>Fri, 12 Apr 2013 07:16:25 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-100.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The Arkansas State Highway and Transportation Department (AHTD) will hold a Public Involvement Meeting in Hot Springs to discuss plans for widening Highway 7 from Highway 290 to the Ouachita River Bridge (Lake Hamilton), according to AHTD officials. <br/>
<p>The meeting will be held on Thursday, April 18th, from 4:00 p.m. to 7:00 p.m., at Lake Hamilton Baptist Church, in the Fellowship Hall. The church is located at 5963 Central Avenue in Hot Springs. The public is invited to visit anytime during the scheduled hours to view displays, ask questions and offer comments. </p>
<p>For more information, contact the Arkansas State Highway and Transportation Department’s Environmental Division at 501-569-2281. </p>]]></description>
    </item>
    <item>
      <title>Training Exercise to Close Portion of Highway 96 on the Evening of April 16</title>
      <pubDate>Thu, 11 Apr 2013 15:56:21 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/District%204%20Releases/041113_DOE_release.pdf</link>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[State Highway 96 will be closed to traffic from Fort Smith Blvd. to the Fort Chaffee South Boundary Road on April 16 between 8:00 pm and midnight. The Department of Energy’s Office of Secure Transportation (OST) said the closure will allow OST to conduct training exercises. <br/><br/>Questions about the closure should be addressed to the TRACOM Exercise Control Center (ECC) at (479) 709-5302 /5303. The same section of the road will be closed for the same time period on April 30 and on May 7.]]></description>
    </item>
    <item>
      <title>Rolling Lane Closure Scheduled for I-30 Frontage Road in Pulaski County</title>
      <pubDate>Thu, 11 Apr 2013 09:54:25 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-095.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Crews performing pavement testing on the Interstate 30 frontage road in the Interstate 30/430 interchange area of Little Rock will require a rolling lane closure next week, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The testing will require a rolling lane closure in one of the two westbound lanes of the frontage road on Monday, April 15th. The lane closure will be located between Mabelvale Pike and Vimy Ridge Road. The lane closure will be in effect between the hours of 9:00 a.m. and 2:00 p.m., weather permitting. One lane will remain open, traffic delays will be minimal. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones.</p>]]></description>
    </item>
    <item>
      <title>Maintenance on I-430 Requires Lane Closure In Little Rock </title>
      <pubDate>Mon, 8 Apr 2013 15:59:13 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-099.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Routine maintenance on Interstate 430 will require a lane closure in Little Rock, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require the northbound outside lane of Interstate 430 to be closed between the Colonel Glenn Road Interchange and the 36th Street overpass. The closure will be Tuesday, April 9th, between 9:00 a.m. and 10:00 a.m.</p>]]></description>
    </item>
    <item>
      <title>Inspection of White River Bridge Requires Westbound Detour on I-40 in Prairie County</title>
      <pubDate>Mon, 8 Apr 2013 15:58:34 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-098.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[An inspection of the White River Bridge on Interstate 40 will require a detour of westbound traffic, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require all westbound traffic to be diverted to Highway 70 at exit 202 in Biscoe. Traffic will be routed back on Interstate 40 at mile marker 193 in Hazen. The detour will be Tuesday, April 9th from 6:00 a.m. until 8:00 a.m. </p>
<p>On March 25th, inspectors discovered damage during a routine examination of the bridge. As a safety precaution, eastbound traffic was diverted away from the damaged area until the bridge was safe for traffic. Now that repairs are complete, the bridge must undergo a final inspection. </p>
<p>The Interstate 40 White River Bridge is inspected every 12 months. It’s estimated that 30,000 vehicles cross the bridge daily, 58 percent of which are tractor-trailers. The bridge was constructed in 1968 and is 2,701 feet in length. It is scheduled to be replaced in 2015.</p>]]></description>
    </item>
    <item>
      <title>Public Involvement - Hwy. 290 - Ouachita River Bridge (Hwy. 7)</title>
      <pubDate>Mon, 8 Apr 2013 11:41:52 -0500</pubDate>
      <link>http://www.arkansashighways.com/public_meetings/2013/060432/060432.aspx</link>
      <author>info@arkansashighways.com</author>
      <category>Upcoming Events</category>
      <description><![CDATA[WHEN: Thursday, April 18, 2013 4:00 p.m. to 7:00 p.m. 
<p>WHERE: Lake Hamilton Baptist Church (Fellowship Hall) 5963 Central Avenue in Hot Springs </p>]]></description>
    </item>
    <item>
      <title>Public Involvement to discuss findings from the Hwy. 10 Improvement Study</title>
      <pubDate>Mon, 8 Apr 2013 11:40:52 -0500</pubDate>
      <link>http://www.arkansashighways.com/public_meetings/2013/061342/061342.aspx</link>
      <author>info@arkansashighways.com</author>
      <category>Upcoming Events</category>
      <description><![CDATA[WHEN: Thursday, April 18, 2013 4:00 p.m. to 7:00 p.m. 
<p>WHERE: Don R. Roberts Elementary School (Cafeteria) 16601 LaMarche Drive in Little Rock </p>]]></description>
    </item>
    <item>
      <title>News conference to recognize National Work Zone Safety week.</title>
      <pubDate>Mon, 8 Apr 2013 11:37:04 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-094.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News Conference</category>
      <description><![CDATA[When: Thursday, April 11 at 10:15 a.m. <br/>
<p>April is recognized around the country as a time for Work Zone Safety Awareness. Construction recently began in Fort Smith on the $78.8 million I-540 rehabilitation project and will continue for another year, and everyone needs to do their part to make this construction project a safe route to travel.</p>]]></description>
    </item>
    <item>
      <title>Training Exercise to Close Portion of Highway 96 on the Evening of April 9</title>
      <pubDate>Fri, 5 Apr 2013 15:35:25 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/District%204%20Releases/040913_DOE_release.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[State Highway 96 will be closed to traffic from Fort Smith Blvd. to the Fort Chaffee South Boundary Road on April 9 between 8:00 pm and midnight. The Department of Energy’s Office of Secure Transportation (OST) said the closure will allow OST to conduct training exercises. <br/>
<p>Questions about the closure should be addressed to the TRACOM Exercise Control Center (ECC) at(479) 709-5302 /5303. The same section of the road will be closed for the same time period on April 16 and 30 and on May 7.</p>]]></description>
    </item>
    <item>
      <title>Improvements to I-55</title>
      <pubDate>Fri, 5 Apr 2013 11:34:13 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-097.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Improvements on Interstate 55 will require lane closures beginning next week in Crittenden County, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>Monday night, April 8th, workers will begin resurfacing the southbound lanes of Interstate 55. The work will begin at the James Mill exit, just north of Marion. It will continue south to Interstate 40.</p>
<p>&nbsp;The work is expected to last about two months. Crews will alternate closing the inside and outside lanes between the hours of 8:00 p.m. and 7:00 a.m. each night. This will allow one lane to be open at all times. </p>
<p>This project is part of the 2011 Interstate Rehabilitation Program that will improve 455 miles of Arkansas’ Interstates in the coming years.</p>]]></description>
    </item>
    <item>
      <title>Overhead sign Installations on I-30 in Miller County</title>
      <pubDate>Fri, 5 Apr 2013 11:33:29 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-096.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Crews installing overhead signs on Interstate 30 will require temporary lane closures next week in Miller County, according to Arkansas State Highway and Transportation Department (AHTD) officials. 
<p><br/>The work will begin Tuesday night, April 9th and concludes Friday morning, April 12th. The work will only take place between the hours of 11:00 p.m. and 5:00 a.m., weather permitting. The area affected will be on Interstate 30 between Jefferson Avenue and Highway 108, east of Texarkana. The project will require the eastbound and westbound lanes to be closed for short intervals not to exceed 10 minutes.</p>]]></description>
    </item>
    <item>
      <title>Maintenance on I-30 Median Wall in Pulaski County</title>
      <pubDate>Fri, 5 Apr 2013 11:31:57 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-093.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Maintenance work on an Interstate 30 median wall will require a lane closure next week, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require the westbound inside lane of Interstate 30 to be closed between mile markers 139 and 142. That’s located from just south of the I-30/I-630 interchange in Little Rock to just south of the I-30/I-40 interchange in North Little Rock. The closures will be Tuesday, April 9th through Wednesday, April 10th, between 9:00 a.m. and 3:00 p.m. each day, weather permitting. </p>
<p>Crews will be doing routine maintenance including general cleaning, weed eating, and drain clearing. This work can’t be accomplished under normal traffic conditions due to the lack of space between traffic lanes and the median wall.</p>]]></description>
    </item>
    <item>
      <title>Commission Meeting/Bid Letting</title>
      <pubDate>Mon, 8 Apr 2013 11:24:53 -0500</pubDate>
      <link>http://www.arkansashighways.com/bid_letting_commission_meetings.aspx</link>
      <author>info@arkansashighways.com</author>
      <category>Commission Meeting</category>
      <description><![CDATA[The next Highway Commission business meeting and Bid Letting will be held at Arkansas State Highway and Transportation Department Headquarters on April 17, 2013. <br/>
<p>Advertisement and availability of Plans and Proposals for projects authorized for each of these lettings will be four (4) weeks prior to the letting date. </p>
<p>The Proposal Holders List of prime contractors holding bid documents on projects for these lettings will be posted in the PRELETTING INFORMATION Library three times -- the first time will be three (3) weeks prior to the letting date and the final posting will be one (1) week prior to the letting date. </p>]]></description>
    </item>
    <item>
      <title>Public Involvement - Leroy Pond Drive - Garland Ave. (Hwy. 112) (Fayetteville)</title>
      <pubDate>Wed, 3 Apr 2013 12:47:58 -0500</pubDate>
      <link>http://www.arkansashighways.com/public_meetings/2013/040582/040582.aspx</link>
      <author>info@arkansashighways.com</author>
      <category>Upcoming Events</category>
      <description><![CDATA[Public Involvement - Leroy Pond Drive - Garland Ave. (Hwy. 112) (Fayetteville) <br/>
<p>WHEN: Thursday, April 4, 2013 4:00 p.m. to 7:00 p.m. </p>
<p>WHERE: Fayetteville High School (Cafeteria) 994 W. Martin Luther King Blvd. in Fayetteville </p>]]></description>
    </item>
    <item>
      <title>Public Involvement Meeting - Hwy. 180 - Leroy Pond Drive (Hwy. 112) (Fayetteville)</title>
      <pubDate>Wed, 3 Apr 2013 12:46:21 -0500</pubDate>
      <link>http://www.arkansashighways.com/public_meetings/2013/040581/040581.aspx</link>
      <author>info@arkansashighways.com</author>
      <category>Upcoming Events</category>
      <description><![CDATA[What: Public Involvement - Hwy. 180 - Leroy Pond Drive (Hwy. 112) (Fayetteville) <br/>
<p>WHEN: Thursday, April 4, 2013 4:00 p.m. to 7:00 p.m. </p>
<p>WHERE: Fayetteville High School (Cafeteria) 994 W. Martin Luther King Blvd. in Fayetteville </p>]]></description>
    </item>
    <item>
      <title>Arkansas Highways Newsletter - April Issue</title>
      <pubDate>Wed, 3 Apr 2013 12:00:41 -0500</pubDate>
      <link>http://www.arkansashighways.com/newsletters/newsletter.aspx</link>
      <author>info@arkansashighways.com</author>
      <category>AHTD Newsletters</category>
      <description><![CDATA[Current Employee News]]></description>
    </item>
    <item>
      <title>Improvements to Interstate 530 Require Traffic Shift in Pulaski County</title>
      <pubDate>Wed, 3 Apr 2013 10:47:11 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR13-092.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Improvements on Interstate 530 will require a traffic shift beginning Friday morning in Pulaski County, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require I-530 southbound traffic to shift to a northbound lane at Bingham Road in southern Pulaski County. The shift will extend to near the Highway 167 exit. Northbound and southbound traffic will be limited to one lane in each direction and will be separated by a temporary concrete wall. </p>
<p>The change in traffic flow will begin Friday, April 5th at 9:00 a.m. It will continue for approximately 3 months while the bridge at Lorance Creek is replaced and the adjacent southbound lanes are reconstructed.</p>]]></description>
    </item>
    <item>
      <title>Bridge Inspection Requires Lane Closure on Highway 367 (Arch Street) Postponed</title>
      <pubDate>Wed, 3 Apr 2013 10:43:43 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-091.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[A routine bridge inspection on Highway 367 (S. Arch Street) will require a lane closure next week, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require the northbound lane of Highway 367 (S. Arch Street) to be closed on the Union Pacific Railroad bridge located between Interstate 30 and Roosevelt Road near Interstate Park in Little Rock. The closures will be Monday, April 8th through Tuesday, April 9th, between 9:00 a.m. and 3:00 p.m. each day, weather permitting. Traffic will be controlled using flaggers and warning signs. </p>
<p>The work was scheduled for this week. However, it’s being postponed due to rain. Motorists should exercise caution when approaching and traveling through all highway work zones.</p>]]></description>
    </item>
    <item>
      <title>Maintenance on Interstate 30 Median Wall Requires Lane Closure in Pulaski County</title>
      <pubDate>Fri, 29 Mar 2013 08:23:54 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-087.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[A routine bridge inspection on Highway 367 (S. Arch Street) will require a lane closure next week, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require the northbound lane of Highway 367 (S. Arch Street) to be closed on the Union Pacific Railroad bridge located between Interstate 30 and Roosevelt Road near Interstate Park in Little Rock. The closures will be Wednesday, April 3rd through Thursday, April 4th, between 9:00 a.m. and 3:00 p.m. each day, weather permitting. Traffic will be controlled using flaggers and warning signs. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. Additional travel related information can be found at ArkansasHighways.com. You can also follow us on Twitter @AHTD.</p>]]></description>
    </item>
    <item>
      <title>Bridge Inspection Requires Lane Closure on Highway 367 (Arch Street) in Little Rock</title>
      <pubDate>Fri, 29 Mar 2013 07:11:45 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-085.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Work to restore Interstate 40 eastbound traffic on the White River Bridge is now complete. The eastbound lane was opened at 3:00 p.m. today, according to the Arkansas Highway and Transportation Department (AHTD) officials. <br/>
<p>Inspectors discovered damage during a routine examination of the bridge on Monday, March 25th. As a safety precaution, all eastbound traffic was detoured. Crews worked around the clock to re-establish traffic flow while repairs are being made. Images of that work can be found on Flickr. </p>
<p>The Interstate 40 White River Bridge is inspected every 12 months. It’s estimated that 30,000 vehicles cross the bridge daily, 58 percent of which are tractor-trailers. The bridge was constructed in 1968 and is 2,701 feet in length. It is scheduled to be replaced in 2015. </p>
<p>This area of Interstate 40 continues to undergo major construction. It’s scheduled to be complete in July. Meantime, drivers are urged to use extreme caution when entering this or any highway work zone. </p>
<p>Additional travel information can be found at ArkansasHighways.com. You can also follow us on Twitter @AHTD.</p>]]></description>
    </item>
    <item>
      <title>Training Exercise to Close Portion of Highway 96 on the Evening of April 2</title>
      <pubDate>Thu, 28 Mar 2013 15:23:37 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/District%204%20Releases/032813_DOE_release.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Training Exercise to Close Portion of Highway 96 on the Evening of April 2 <br/>
<p>State Highway 96 will be closed to traffic from Fort Smith Blvd. to the Fort Chaffee South Boundary Road on April 2 between 8:00 pm and midnight. The Department of Energy’s Office of Secure Transportation (OST) said the closure will allow OST to conduct training exercises. </p>
<p>Questions about the closure should be addressed to the TRACOM Exercise Control Center (ECC) at(479) 709-5302 /5303. The same section of the road will be closed for the same time period on April 9, 16 and 30 and on May 7.</p>]]></description>
    </item>
    <item>
      <title>I-540 Traffic Pattern Change in Fort Smith and Van Buren</title>
      <pubDate>Wed, 27 Mar 2013 11:23:26 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/District%204%20Releases/032712%20%20I-540%20News%20Release.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The Contractor has informed the Arkansas State Highway and Transportation Department District Four Headquarters at Fort Smith of planned traffic pattern changes on I-540 in Fort Smith and Van Buren. <br/>
<p>On Friday, March 29, beginning at 8:00 p. m. southbound traffic will be diverted to the existing northbound lanes of I-540 from north of Highway 22 to south of the Cliff Drive overpass. Northbound and southbound traffic will be separated by a temporary concrete barrier wall. Temporary ramps will allow access to the Highway 22 interchange. </p>
<p>The traffic pattern change will allow the Contractor to replace the existing bridge over Highway 22, rubblize the existing concrete driving surface, and place a new asphalt driving surface on the existing southbound lanes. This stage will take approximately four months to complete. Completion of the project is expected in mid-2014. </p>
<p>The motorists are reminded that the traffic on the main lanes of I-540 should not stop to allow ramp traffic to enter the interstate. Motorists on the main lanes should maintain a steady speed and leave room between their vehicle and others and motorists on the ramps should evaluate the traffic on the main lanes and enter when there is space between main lane traffic to safely do so. </p>
<p>Motorists are reminded that the speed limit in the work zone is reduced from 65 miles per hour to 55 miles per hour, for the safety of the construction workers and the motorists. Increased traffic enforcement is scheduled in this work area and, under Arkansas law, fines are doubled for violations in the work zone. </p>
<p>Motorists are urged to use care and think ahead when traveling through the work zone. They should remember to Obey the Posted Speed Limits and Other Regulatory Signing; to Maintain a Steady Speed; to Leave Room between them and other vehicles; to Be Aware of Road Conditions in front of them; and to Anticipate the Need to Stop or Reduce Speed Substantially. Motorists are advised to consider alternate routes to reduce congestion in the work zone. </p>
<p>In November, 2012, the Arkansas Highway Commission awarded a contract, in the amount of $78.8 million, to Kiewit Infrastructure South Company of Fort Worth, Texas. The project includes re-construction of nine bridge structures, replacement of the driving surfaces of two bridge structures carrying traffic on the main lanes of I-540, and raising of bridges carrying Highway 64 traffic over I-540. The existing concrete pavement is being rubblized, to create a drainage layer, and overlaid with asphalt pavement. </p>
<p>Up-to-date information on lane closures on this and other projects in the state is available at www.arkansashighways.com.</p>]]></description>
    </item>
    <item>
      <title>Eastbound I- 40 Traffic Resumes on White River Bridge in Prairie County </title>
      <pubDate>Wed, 27 Mar 2013 15:32:02 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-085.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The Contractor has informed the Arkansas State Highway and Transportation Department District Four Headquarters at Fort Smith of planned traffic pattern changes on I-540 in Fort Smith and Van Buren. <br/>
<p>On Friday, March 29, beginning at 8:00 p. m. southbound traffic will be diverted to the existing northbound lanes of I-540 from north of Highway 22 to south of the Cliff Drive overpass. Northbound and southbound traffic will be separated by a temporary concrete barrier wall. Temporary ramps will allow access to the Highway 22 interchange. </p>
<p>The traffic pattern change will allow the Contractor to replace the existing bridge over Highway 22, rubblize the existing concrete driving surface, and place a new asphalt driving surface on the existing southbound lanes. This stage will take approximately four months to complete. Completion of the project is expected in mid-2014. </p>
<p>The motorists are reminded that the traffic on the main lanes of I-540 should not stop to allow ramp traffic to enter the interstate. Motorists on the main lanes should maintain a steady speed and leave room between their vehicle and others and motorists on the ramps should evaluate the traffic on the main lanes and enter when there is space between main lane traffic to safely do so. </p>
<p>Motorists are reminded that the speed limit in the work zone is reduced from 65 miles per hour to 55 miles per hour, for the safety of the construction workers and the motorists. Increased traffic enforcement is scheduled in this work area and, under Arkansas law, fines are doubled for violations in the work zone. </p>
<p>Motorists are urged to use care and think ahead when traveling through the work zone. They should remember to Obey the Posted Speed Limits and Other Regulatory Signing; to Maintain a Steady Speed; to Leave Room between them and other vehicles; to Be Aware of Road Conditions in front of them; and to Anticipate the Need to Stop or Reduce Speed Substantially. Motorists are advised to consider alternate routes to reduce congestion in the work zone. </p>
<p>In November, 2012, the Arkansas Highway Commission awarded a contract, in the amount of $78.8 million, to Kiewit Infrastructure South Company of Fort Worth, Texas. The project includes re-construction of nine bridge structures, replacement of the driving surfaces of two bridge structures carrying traffic on the main lanes of I-540, and raising of bridges carrying Highway 64 traffic over I-540. The existing concrete pavement is being rubblized, to create a drainage layer, and overlaid with asphalt pavement. </p>
<p>Up-to-date information on lane closures on this and other projects in the state is available at www.arkansashighways.com.</p>]]></description>
    </item>
    <item>
      <title>Eastbound I- 40 Traffic Resumes on White River Bridge in Prairie County </title>
      <pubDate>Fri, 29 Mar 2013 15:00:00 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-085.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Work to restore Interstate 40 eastbound traffic on the White River Bridge is now complete. The eastbound lane was opened at 3:00 p.m. today, according to the Arkansas Highway and Transportation Department (AHTD) officials. <br/>
<p>Inspectors discovered damage during a routine examination of the bridge on Monday, March 25th. As a safety precaution, all eastbound traffic was detoured. Crews worked around the clock to re-establish traffic flow while repairs are being made. </p>
<p>The Interstate 40 White River Bridge is inspected every 12 months. It’s estimated that 30,000 vehicles cross the bridge daily, 58 percent of which are tractor-trailers. The bridge was constructed in 1968 and is 2,701 feet in length. It is scheduled to be replaced in 2015. </p>
<p>This area of Interstate 40 continues to undergo major construction. It’s scheduled to be complete in July. Meantime, drivers are urged to use extreme caution when entering this or any highway work zone. Additional travel information can be found at ArkansasHighways.com. You can also follow us on Twitter @AHTD.</p>]]></description>
    </item>
    <item>
      <title>I-540 Traffic Pattern Change in Fort Smith and Van Buren</title>
      <pubDate>Wed, 27 Mar 2013 10:35:05 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/District%204%20Releases/032712%20%20I-540%20News%20Release.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The Contractor has informed the Arkansas State Highway and Transportation Department District Four Headquarters at Fort Smith of planned traffic pattern changes on I-540 in Fort Smith and Van Buren. <br/>
<p>On Friday, March 29, beginning at 8:00 p. m. southbound traffic will be diverted to the existing northbound lanes of I-540 from north of Highway 22 to south of the Cliff Drive overpass. Northbound and southbound traffic will be separated by a temporary concrete barrier wall. Temporary ramps will allow access to the Highway 22 interchange. </p>
<p>The traffic pattern change will allow the Contractor to replace the existing bridge over Highway 22, rubblize the existing concrete driving surface, and place a new asphalt driving surface on the existing southbound lanes. </p>
<p>This stage will take approximately four months to complete. Completion of the project is expected in mid-2014. </p>
<p>The motorists are reminded that the traffic on the main lanes of I-540 should not stop to allow ramp traffic to enter the interstate. Motorists on the main lanes should maintain a steady speed and leave room between their vehicle and others and motorists on the ramps should evaluate the traffic on the main lanes and enter when there is space between main lane traffic to safely do so. </p>
<p>Motorists are reminded that the speed limit in the work zone is reduced from 65 miles per hour to 55 miles per hour, for the safety of the construction workers and the motorists. Increased traffic enforcement is scheduled in this work area and, under Arkansas law, fines are doubled for violations in the work zone. </p>
<p>Motorists are urged to use care and think ahead when traveling through the work zone. They should remember to Obey the Posted Speed Limits and Other Regulatory Signing; to Maintain a Steady Speed; to Leave Room between them and other vehicles; to Be Aware of Road Conditions in front of them; and to Anticipate the Need to Stop or Reduce Speed Substantially. Motorists are advised to consider alternate routes to reduce congestion in the work zone. </p>
<p>In November, 2012, the Arkansas Highway Commission awarded a contract, in the amount of $78.8 million, to Kiewit Infrastructure South Company of Fort Worth, Texas. The project includes re-construction of nine bridge structures, replacement of the driving surfaces of two bridge structures carrying traffic on the main lanes of I-540, and raising of bridges carrying Highway 64 traffic over I-540. The existing concrete pavement is being rubblized, to create a drainage layer, and overlaid with asphalt pavement. </p>
<p>Up-to-date information on lane closures on this and other projects in the state is available at www.arkansashighways.com.</p>]]></description>
    </item>
    <item>
      <title>Update - White River Bridge Eastbound Detour on I-40 in Prairie County </title>
      <pubDate>Tue, 26 Mar 2013 15:29:52 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-084.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Repairs to the White River Bridge on Interstate 40 will continue to require a detour of eastbound traffic, according to Arkansas State Highway and Transportation Department (AHTD) officials.<br/>
<p>&nbsp;Inspectors discovered damage during a routine examination of the bridge on Monday. As a safety precaution, the Arkansas State Highway and Transportation Department immediately decided to divert all eastbound traffic away from the damaged area. Since that time, crews have been working around the clock to make repairs. </p>
<p>Currently, drivers are being detoured at Exit 193 to Highway 70 in Hazen. Traffic is being routed back on Interstate 40 at mile marker 202 at Biscoe. Westbound traffic will not be affected. This detour is expected to continue until sometime Thursday, March 28th, weather permitting. </p>
<p>The Interstate 40 White River Bridge is inspected every 12 months. It’s estimated that 30,000 vehicles cross the bridge daily, 58 percent of which are tractor-trailers. The bridge was constructed in 1968 and is 2,701 feet in length. It is scheduled to be replaced in 2015. </p>
<p>Motorists should exercise caution when approaching and traveling through all highway work zones. Information on lane closures, construction projects, and public hearings can be found at ArkansasHighways.com. You can also follow us on Twitter @AHTD.</p>]]></description>
    </item>
    <item>
      <title>Repairs on White River Bridge Require Eastbound Detour on I- 40 in Prairie County </title>
      <pubDate>Mon, 25 Mar 2013 16:45:00 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-083.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Crews performing repairs to the White River bridge on Interstate 40 will require a detour of eastbound traffic, according to Arkansas State Highway and Transportation Department (AHTD) officials.&nbsp;<br/>
<p>Inspectors discovered some damage during a routine examination of the bridge. While there is no immediate danger, the Arkansas Highway and Transportation Department will detour eastbound traffic while the bridge undergoes repairs. </p>
<p>All eastbound traffic will be detoured at Exit 193 to Highway 70 in Hazen. Traffic will be routed back on Interstate 40 at mile marker 202 at Biscoe. Westbound traffic will not be affected at this time. This detour is expected to be in place several days. AHTD will provide an update Tuesday. </p>
<p>The Interstate 40 White River Bridge was constructed in 1968 and is 2,701 feet in length. It is scheduled to be replaced in 2015.</p>]]></description>
    </item>
    <item>
      <title>Utility Work Requires Lane Closure on Highway 305 in Lonoke County </title>
      <pubDate>Fri, 22 Mar 2013 14:21:02 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-082.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Utility work will require a lane closure on Highway 305 in Lonoke County, according to Arkansas State Highway and Transportation Department (AHTD) officials. 
<p><br/>A natural gas company is scheduled to make utility repairs. This will require the excavation of the northbound lane of Highway 305 just north of Ernie Davis Road. That’s just north of the Highway 67/Highway 305 intersection in Austin. The project will begin Saturday morning, March 23rd and be complete by Tuesday evening, March 26th. Traffic will be controlled by a 24/7 flagger operation that will be illuminated at night. A police officer will also be on the scene. <br/></p>
<p>Any questions about the project should be directed to Natural Gas Pipeline Company at 713-551-5207. </p>
<p><br/>Motorists should exercise caution when approaching and traveling through all highway work zones.</p>]]></description>
    </item>
    <item>
      <title>Improvements to I-630 &amp; Financial Centre Parkway will Require Lane Closures</title>
      <pubDate>Fri, 22 Mar 2013 14:21:01 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-080.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Improvements to Interstate 630 and Financial Centre Parkway will require lane closures next week in West Little Rock, according to Arkansas State Highway and Transportation Department (AHTD) officials.
<p>&nbsp;</p>
<p>The work will require the westbound outside lane and eastbound outside lane of Financial Centre Parkway to be closed Monday, March 25th through Friday, March 29th between 9:00 a.m. and 3:00 p.m., weather permitting. Drivers traveling west on Financial Centre Parkway may encounter delays. <br/></p>
<p>The purpose is to improve drainage along Financial Centre Parkway and near the intersection of Shackleford Road during heavy rain events. </p>
<p><br/>Motorists should exercise caution when approaching and traveling through all highway work zones.</p>]]></description>
    </item>
    <item>
      <title>Improvements to Interstate 430 will Require Lane Closures in West Little Rock </title>
      <pubDate>Fri, 22 Mar 2013 14:20:59 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-081.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Improvements to Interstate 430 will require a lane closure next week at the I-430/I-630 (Big Rock) Interchange in West Little Rock, according to Arkansas State Highway and Transportation Department (AHTD) officials. <br/>
<p>The work will require the southbound outside lane of Interstate 430 to be closed between the Markham Street overpass and the Hermitage Road entrance ramp. The closure will be Tuesday, March 26th between 9:00 a.m. and 3:00 p.m. In the event of poor weather conditions, the project will be postponed until Wednesday, March 27th between 9:00 a.m. and 3:00 p.m., weather permitting. </p>
<p><br/>The purpose is to construct a permanent barrier wall to improve traffic flow for motorists entering or exiting I-430 at Shackleford Road. </p>
<p><br/>Motorists should exercise caution when approaching and traveling through all highway work zones.</p>]]></description>
    </item>
    <item>
      <title>Maintenance on Kerr Road Overpass Requires Lane Closures on I-40 in Lonoke County </title>
      <pubDate>Thu, 21 Mar 2013 15:20:00 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-079.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Maintenance work on the Kerr Road overpass will require temporary lane closures next week on Interstate 40 in Lonoke County, according to Arkansas State Highway and Transportation Department (AHTD) officials. 
<p>&nbsp;</p>
<p>The work will require the eastbound outside lane of Interstate 40 to be closed between mile markers 163 and 165, west of Lonoke. The closures will be Monday, March 25th through Tuesday, March 26st, between 9:00 a.m. and 3:00 p.m. each day, weather permitting. </p>
<p>The project will also require the westbound inside lane of Interstate 40 to be closed between mile markers 163 and 167, west of Lonoke. The closures will be Wednesday, March 27th through Thursday, March 28th, between 9:00 a.m. and 3:00 p.m. each day, weather permitting. </p>
<p>Motorists should exercise caution when approaching</p>]]></description>
    </item>
    <item>
      <title>Maintenance on I-440 Requires Lane Closures in North Little Rock </title>
      <pubDate>Wed, 20 Mar 2013 11:51:20 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-078.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Maintenance work on Interstate 440 requires lane closures tonight in North Little Rock, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Accident clean-up Requires Temporary closure of I-40 WB in Prairie County</title>
      <pubDate>Tue, 19 Mar 2013 16:33:18 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-77.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[An accident clean-up will require the closure of Interstate 40 westbound in Prairie County, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Design Public Hearing in North Little Rock to discuss Hwy 70 (Broadway Bridge)</title>
      <pubDate>Tue, 19 Mar 2013 08:05:00 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-076.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The Arkansas State Highway and Transportation Department (AHTD) will hold a Design Public Hearing in North Little Rock to discuss additional design plans for the Highway 70 (Broadway) Bridge crossing the Arkansas River, according to AHTD officials.]]></description>
    </item>
    <item>
      <title>Maintenance on Kerr Road Overpass Requires Lane Closures on I-40 </title>
      <pubDate>Fri, 15 Mar 2013 11:34:50 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-075.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Maintenance work on the Kerr Road overpass will require temporary lane closures next week on Interstate 40 in Lonoke County, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Broadway Bridge Design Public Hearing</title>
      <pubDate>Wed, 13 Mar 2013 12:01:27 -0500</pubDate>
      <link>http://www.arkansashighways.com/public_meetings/2013/061275/061275.aspx</link>
      <author>info@arkansashighways.com</author>
      <category>Upcoming Events</category>
      <description><![CDATA[Meeting Date: Thursday, March 28, 2013 from 4:00 to 7:00 p.m.
<p>Meeting Location: Arkansas Transit Association (Training Room) 620 West Broadway Street North Little Rock, AR 72114</p>]]></description>
    </item>
    <item>
      <title>I-540 Traffic Pattern Change in Fort Smith and Van Buren</title>
      <pubDate>Tue, 12 Mar 2013 15:22:44 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/District%204%20Releases/031213-I-540%20News%20Release.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The Contractor has informed the Arkansas State Highway and
Transportation Department District Four Headquarters at Fort Smith of planned changes to traffic patterns in the construction zone on I-540 between Highway 22 (Rogers Avenue) in Fort Smith and I-40 in Van Buren.]]></description>
    </item>
    <item>
      <title>Repairs to Young Rd. Overpass on I-40 in North Little Rock</title>
      <pubDate>Mon, 11 Mar 2013 15:24:07 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-073.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[AHTD officials re-opened the Young Road overpass on Interstate 40 in North Little Rock on Saturday. However, continued repairs will require lane closures on the overpass, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Inspection of Young Rd. Overpass Continues</title>
      <pubDate>Fri, 8 Mar 2013 15:25:35 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-071.pdf</link>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Crews continue to analyze and repair damage associated with Thursday’s tractor-trailer accident at the Young Road overpass on Interstate 40 in North Little Rock, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Maintenance on Hwy 10 Bridge in Downtown Little Rock to require Lane Closure</title>
      <pubDate>Fri, 8 Mar 2013 13:26:19 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-072.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Crews conducting repair work on the Highway 10 (LaHarpe Boulevard) Bridge in downtown Little Rock will require a lane closure, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Accident Requires the Closure of Young Road Overpass over I-40</title>
      <pubDate>Thu, 7 Mar 2013 16:23:29 -0600</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-070.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[An accident requires the closure of the Young Road overpass over Interstate 40 in North Little Rock, according to Arkansas State Highway and Transportation Department (AHTD) officials.
The accident occurred in the westbound lane of Interstate 40 at the Young Road Overpass, which is east of the Crystal Hill overpass (mile marker 149) in North Little Rock.]]></description>
    </item>
    <item>
      <title>Overhead Sign Installation Requires Temporary Lane Closures on I-30 in Miller County </title>
      <pubDate>Thu, 7 Mar 2013 14:13:13 -0600</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-068.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Crews installing overhead signs will require temporary lane closures next week in Miller County, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Interstate 430 Access Ramp Re-opened</title>
      <pubDate>Thu, 7 Mar 2013 09:27:22 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-069.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Big Rock Interchange</category>
      <description><![CDATA[Crews have re-opened an access ramp to Interstate 430 in the Big Rock Interchange, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Lane Closures in Lonoke County</title>
      <pubDate>Wed, 6 Mar 2013 16:26:36 -0600</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-067.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Crews doing maintenance to the Highway 31 overpass will require lane closures on Interstate 40 and Highway 31 next week in Lonoke, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Re-Striping Postponed on I-430/630</title>
      <pubDate>Tue, 5 Mar 2013 10:29:26 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-066.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Big Rock Interchange</category>
      <description><![CDATA[Crews have been forced to postpone re-striping pavement through the Interstate 430/630 (Big Rock) Interchange, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Accident Clean-up on I-30 Requires Lane Closures in Saline County</title>
      <pubDate>Mon, 4 Mar 2013 16:27:10 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-065.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Environmental crews removing spilled diesel fuel from last Wednesday’s tractor trailer accident in Saline County will require lane closures this week, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Safety Improvements on 430/630</title>
      <pubDate>Fri, 1 Mar 2013 14:03:34 -0600</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-063.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Big Rock Interchange</category>
      <description><![CDATA[Crews will be re-striping pavement to maintain safety through the Interstate 430/630 (Big Rock) Interchange, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Arkansas Highways Magazine - March Issue</title>
      <pubDate>Fri, 1 Mar 2013 12:05:22 -0500</pubDate>
      <link>http://www.arkansashighways.com/magazine.aspx</link>
      <author>info@arkansashighways.com</author>
      <category>AHTD Magazine</category>
      <description><![CDATA[Arkansas Highways Magazine
A bimonthly publication of the Arkansas State Highway & Transportation Department]]></description>
    </item>
    <item>
      <title>Hwy. 71 Lane Closures for Greenwood and Fort Smith</title>
      <pubDate>Fri, 1 Mar 2013 13:25:59 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/District%204%20Releases/030113%20Hwy%2071%20Info%20Release.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The Contractor has informed the Arkansas State Highway and Transportation Department District Four Headquarters at Fort Smith of planned lane closures associated with work to install Wire Rope Safety Fence in the median of Highway 71 from Greenwood to Fort Smith.]]></description>
    </item>
    <item>
      <title>Bridge Maintenance in Lonoke County</title>
      <pubDate>Fri, 1 Mar 2013 08:33:21 -0600</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-064.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Crews conducting bridge maintenance will require a lane closure on Interstate 40 next week in Lonoke County, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Maintenance Work on Bull Shoals Dam to Require Temporary Lane Closures on Hwy 178</title>
      <pubDate>Thu, 28 Feb 2013 16:17:12 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-062.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The U.S. Army Corps of Engineers will conduct maintenance and inspection work on Bull Shoals Dam in Marion County. This will require temporary lane closures on Highway 178, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>New 2013 Arkansas Strategic Highway Safety Plan</title>
      <pubDate>Wed, 27 Feb 2013 14:03:34 -0600</pubDate>
      <link>http://www.arkansashighways.com/planning_research/traffic_safety/strategichighwaysafetyplan.pdf</link>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[2013 Arkansas Strategic Highway Safety Plan now available for viewing]]></description>
    </item>
    <item>
      <title>AHTD to Hold Public Involvement Meeting in Little Rock to discuss I-30/I-430</title>
      <pubDate>Wed, 27 Feb 2013 16:17:52 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-061.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[The Arkansas State Highway and Transportation Department (AHTD) will hold a Public Involvement Meeting in Little Rock to discuss plans for improving the I-30/I-430 Interchange, according to AHTD officials.]]></description>
    </item>
    <item>
      <title>Winter Storm Clean-up Requires Lane Closure on Highway 70 in Garland County</title>
      <pubDate>Mon, 25 Feb 2013 16:18:05 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-060.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Crews continuing to remove winter storm debris along Highway 70 in Garland County will require additional lane closures, according to Arkansas State Highway and Transportation (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Safety Improvements to Interstate 430/630 Interchange </title>
      <pubDate>Fri, 22 Feb 2013 08:19:34 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-057.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Big Rock Interchange</category>
      <description><![CDATA[Crews will be refreshing pavement markings (stripes and raised pavement markers) to maintain safety through the Interstate 430/630 (Big Rock) Interchange, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Notice to Media - Commission Meeting </title>
      <pubDate>Fri, 22 Feb 2013 10:19:25 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-058.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[NOTICE TO MEDIA]]></description>
    </item>
    <item>
      <title>Improvement to Highway 67 Requires Lane Closure in Jacksonville</title>
      <pubDate>Fri, 22 Feb 2013 16:18:13 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-059.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Crews filling potholes on Highway 67 will require a lane closure next week, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Improvement to I-430/I-630 Interchange will Require Temporary Lane Closure </title>
      <pubDate>Fri, 22 Feb 2013 16:19:42 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-056.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Big Rock Interchange</category>
      <description><![CDATA[Crews removing a concrete barrier will require a temporary lane closure at the Interstate 430/Interstate 630 (Big Rock) Interchange in Little Rock, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Accident Clean-Up on I-40 Requires Temporary Lane Closures</title>
      <pubDate>Wed, 20 Feb 2013 16:19:51 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-054.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Crews removing a tractor trailer involved in a Tuesday accident on Interstate 40 in Prairie County will require a lane closure this morning, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Highway 267 Intersection in Searcy Getting Upgrade</title>
      <pubDate>Fri, 15 Feb 2013 14:10:17 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-052.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[An intersection on Highway 267 in Searcy will get an upgrade next week, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Improvements to I-530 in Pine Bluff to Require Lane Closure</title>
      <pubDate>Fri, 15 Feb 2013 12:07:24 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-051.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Crews performing pavement repairs on Interstate 530 will require a lane closure starting next week, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Removal of Pedestrian Bridge will Require Temp. Closure of Hwy 79B near UAPB Campus</title>
      <pubDate>Fri, 15 Feb 2013 11:08:35 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-053.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>News</category>
      <description><![CDATA[Crews removing a pedestrian bridge in Pine Bluff will require the temporary closure of Highway 79B near the UAPB campus, according to Arkansas State Highway and Transportation Department (AHTD) officials.]]></description>
    </item>
    <item>
      <title>Work in Big Rock Interchange to Require Lane Shifting, Turn Restriction</title>
      <pubDate>Thu, 14 Feb 2013 11:12:24 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2013/NR%2013-050.pdf</link>
      <author>info@arkansashighways.com</author>
      <category>Big Rock Interchange</category>
      <description><![CDATA[Major traffic pattern changes are being implemented this weekend at the Big Rock Interchange (I-430/I-630) in Little Rock, according to Arkansas State Highway and Transportation Department (AHTD) officials. The changes will affect motorists on I-630, Financial Centre Parkway, and Shackleford Road, and will involve lane closures, the movement of traffic to newly constructed travel lanes, and the restriction of the left turn movement from westbound I-630 to southbound Shackleford Road.]]></description>
    </item>
    <item>
      <title>Arkansas Highways Newsletter - February Issue</title>
      <pubDate>Fri, 1 Feb 2013 12:02:38 -0500</pubDate>
      <link>http://www.arkansashighways.com/newsletters/newsletter.aspx</link>
      <author>info@arkansashighways.com</author>
      <category>AHTD Newsletters</category>
      <description><![CDATA[Current Employee News]]></description>
    </item>
    <item>
      <title>Arkansas Highways Magazine - January Issue</title>
      <pubDate>Mon, 31 Dec 2012 12:08:40 -0500</pubDate>
      <link>http://www.arkansashighways.com/magazine.aspx</link>
      <category>AHTD Magazine</category>
      <description><![CDATA[Arkansas Highways Magazine
A bimonthly publication of the Arkansas State Highway & Transportation Department]]></description>
    </item>
    <item>
      <title>Interstate 430/630 Updates</title>
      <pubDate>Tue, 17 Jul 2012 15:47:22 -0500</pubDate>
      <link>http://www.arkansashighways.com/430_630_Project/430630_project.aspx</link>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[]]></description>
    </item>
    <item>
      <title>Preliminary STIP 2013-2016</title>
      <pubDate>Mon, 18 Jun 2012 14:46:37 -0500</pubDate>
      <link>http://www.arkansashighways.com/stip/stip.aspx</link>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[]]></description>
    </item>
    <item>
      <title>Update to the Big Rock Interchange Information</title>
      <pubDate>Mon, 4 Jun 2012 12:08:35 -0500</pubDate>
      <link>http://www.arkansashighways.com/430_630_Project/430630_project.aspx</link>
      <author>info@arkansashighways.com</author>
      <category>Big Rock Interchange</category>
      <description><![CDATA[]]></description>
    </item>
    <item>
      <title>Employee Newsletter May 2012</title>
      <pubDate>Fri, 1 Jun 2012 13:51:32 -0500</pubDate>
      <link>http://www.arkansashighways.com/newsletters/newsletter.aspx</link>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[]]></description>
    </item>
    <item>
      <title>Update to the STIP Amendments</title>
      <pubDate>Fri, 1 Jun 2012 10:27:20 -0500</pubDate>
      <link>http://www.arkansashighways.com/stip/stip_amendments.aspx</link>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[]]></description>
    </item>
    <item>
      <title>I-430 Lane Closures</title>
      <pubDate>Thu, 24 May 2012 14:22:21 -0500</pubDate>
      <link>http://www.arkansashighways.com</link>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[]]></description>
    </item>
    <item>
      <title>Work Zone Awareness Week</title>
      <pubDate>Wed, 18 Apr 2012 08:57:37 -0500</pubDate>
      <link>http://www.arkansashighways.com</link>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[]]></description>
    </item>
    <item>
      <title>Request for Letters of Interest</title>
      <pubDate>Mon, 2 Apr 2012 15:38:52 -0500</pubDate>
      <link>http://www.arkansashighways.com/consultant_services/advertisements/advertisements.aspx</link>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[href="http://www.arkansashighways.com/consultant_services/advertisements/Ashdown - Request for LOIs.pdf" target=_blank>City of Ashdown - Request for Letters of Interest from qualified consulting engineering firms for sidewalk construction in Ashdown, Arkansas available until 04/16/12</a></p>
<p><a href="http://www.arkansashighways.com/consultant_services/I-40%20Toll%20Feasibility_RFLOI_WEB.pdf">Request for Letters of Interest for the development of a feasibility study for tolling Interstate 40 from North Little Rock to West Memphis, Arkansas available until 04/18/12</a></p>
<p><a href="http://www.arkansashighways.com/consultant_services/advertisements/I-40 Weigh Station_RLOI_Web.pdf" target=_blank>Request for Letters of Interest from qualified Architectural/Engineering Firms to provide professional services to develop construction plans and specifications for the reconstruction of the Highway Police Weigh Stations on I-40 in Crawford County, Arkansas available until 04/20/12</a></p>
<p><a href="http://www.arkansashighways.com/consultant_services/advertisements/I40_Miss River_TrussInspection_RLOI_Web.pdf" target=_blank>Request for Letters of Interest from qualified consulting firms to perform structural inspection of various elements of the I-40 Mississippi River Bridge available until 04/20/12</a></p>]]></description>
    </item>
    <item>
      <title>News</title>
      <pubDate>Fri, 13 Apr 2012 15:31:40 -0500</pubDate>
      <link>http://www.arkansashighways.com/news/2012/Notice%20of%20Proposed%20Rule%20Making.pdf</link>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[]]></description>
    </item>
    <item>
      <title>News</title>
      <pubDate>Fri, 30 Mar 2012 14:30:25 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2012/news_2012.aspx</link>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[
]]></description>
    </item>
    <item>
      <title>Upcoming Events</title>
      <pubDate>Wed, 11 Apr 2012 15:07:03 -0500</pubDate>
      <link>http://www.arkansashighways.com/</link>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p><a href="http://www.arkansashighways.com/public_meetings/2012/100682/100682.aspx">Location Public Hearing - Future I-555 Access Road Study (Highway 63)</a></p>
<p><a href="http://www.arkansashighways.com/public_meetings/2012/005836/005836.aspx">Public Involvement - White River Structures and Approaches (Newport) (Hwy. 367)</a></p>]]></description>
    </item>
    <item>
      <title>October News Entries</title>
      <pubDate>Mon, 31 Oct 2011 16:28:05 -0600</pubDate>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<a href="http://www.arkansashighways.com/news/2011/070.pdf">Improvements to Interstate 440 in North Little Rock to Require Lane Closure</a><br/><a href="http://www.arkansashighways.com/news/2011/203a.pdf">AHTD Releases More Specific Bond Program Map and Facts</a><br/><a href="http://www.arkansashighways.com/news/2011/203a.pdf">Improvements to Interstate 40 in West Memphis to Require Road Closure</a><br/><a href="http://http//www.arkansashighways.com/news/2011/204.pdf”">Road Closure on Financial Centre Parkway</a><br/><a href="http://http//www.arkansashighways.com/news/2011/Hwy" (6-23-11).pdf” Release Info repair crossing Railroad 59>Highway 59 Roadway Closure for Van Buren</a></a><br/><a href="http://http//www.arkansashighways.com/news/2011/198.pdf">AHTD to Hold Public Meeting in Black Rock</a>0<br/><a href="http://“http://www.arkansashighways.com/news/2011/200.pdf”">AHTD to Hold Public Meeting in Little Rock to Discuss Improvements to Cantrell Road</a><br/><a href="“http://www.arkansashighways.com/news/2011/202.pdf”">Shackleford Road Traffic Patterns Change as Utilities Relocate Near I-430/630 Project</a><br/><a href="“http://www.arkansashighways.com/news/2011/201.pdf”">Repairs to Lighting on Interstate 40 White River Bridge to Require Lane Closure </a><br/><a href="“http://www.arkansashighways.com/news/2011/199.pdf”">Railroad work on Highway 229 in Traskwood to Require Road Closure</a><br/><a href="“http://www.arkansashighways.com/news/2011/197.pdf”">Improvements to Highway 128 in Hot Spring County to Require Road Closure</a><a href="“http://www.arkansashighways.com/news/2011/../../t/2011/193.pdf”"></a><br/><a href="“http://www.arkansashighways.com/news/2011/195.pdf”">Inspection of Interstate 30 Bridge in Pulaski County to Require Lane Closure</a><a href="“http://www.arkansashighways.com/news/2011/../../t/2011/193.pdf”"></a><br/><a href="“http://www.arkansashighways.com/news/2011/196.pdf”">AHTD to Hold Public Meeting in Batesville</a><a href="“http://www.arkansashighways.com/news/2011/../../t/2011/193.pdf”"></a><br/><a href="“http://www.arkansashighways.com/news/2011/194.pdf”">Notice to Media - Commission Schedule</a><a href="“http://www.arkansashighways.com/news/2011/../../t/2011/193.pdf”"></a><br/><a href="“http://www.arkansashighways.com/news/2011/193.pdf”">Repairs to Lighting on Interstate 40 White River Bridge to Require Lane Closure </a><br/><a href="“http://www.arkansashighways.com/news/2011/192.pdf”">West Memphis I-40 Lane Closure</a><br/><a href="“http://www.arkansashighways.com/news/2011/189.pdf”">AHTD To Hold Public Meetings in Springdale and Rogers</a><a href="“http://www.arkansashighways.com/news/2011/../../t/2011/190.pdf”"></a><a href="“http://www.arkansashighways.com/news/2011/../../t/2011/188.pdf”"></a><br/><a href="“http://www.arkansashighways.com/news/2011/191" (2).pdf”>Railroad Work on Highway 365 to Continue</a><a href="“http://www.arkansashighways.com/news/2011/../../t/2011/188.pdf”"></a><br/><a href="“http://www.arkansashighways.com/news/2011/190.pdf”">Maintenance on Grand Avenue in Hot Springs to Require Lane Closures this Week </a><a href="“http://www.arkansashighways.com/news/2011/../../t/2011/188.pdf”"></a><br/><a href="“http://www.arkansashighways.com/news/2011/Bid" Craighead.pdf” 2011 October News>Arkansas State Highway Commission Opens Bids For Improvements in Craighead County</a><br/><a href="“http://www.arkansashighways.com/news/2011/Bid" 2011 October News Crawford-Washington.pdf”>Arkansas State Highway Commission Opens Bids For Improvements in Crawford and Washington Counties</a><br/><a href="“http://www.arkansashighways.com/news/2011/Bid" 2011 October News Crawford.pdf”>Arkansas State Highway Commission Opens Bids For Improvements in Crawford County</a><br/><a href="“http://www.arkansashighways.com/news/2011/Bid" 2011 October News Crittenden.pdf”>Arkansas State Highway Commission Opens Bids For Improvements in Crittenden County</a><br/><a href="“http://www.arkansashighways.com/news/2011/Bid" 2011 October News Jefferson.pdf” &amp; Grant>Arkansas State Highway Commission Opens Bids For Improvements in Grant and Jefferson Counties</a><br/><a href="“http://www.arkansashighways.com/news/2011/Bid" 2011 October News Grant.pdf”>Arkansas State Highway Commission Opens Bids For Improvements in Grant County</a><br/><a href="“http://www.arkansashighways.com/news/2011/Bid" 2011 October News Greene.pdf”>Arkansas State Highway Commission Opens Bids For Improvements in Greene County</a><br/><a href="“http://www.arkansashighways.com/news/2011/Bid" 2011 October News Spring.pdf” Hot>Arkansas State Highway Commission Opens Bids For Improvements in Hot Spring County</a><br/><a href="“http://www.arkansashighways.com/news/2011/Bid" 2011 October News Lonoke.pdf”>Arkansas State Highway Commission Opens Bids For Improvements in Lonoke County</a><br/><a href="“http://www.arkansashighways.com/news/2011/Bid" 2011 October News Miller.pdf”>Arkansas State Highway Commission Opens Bids For Improvements in Miller County</a><br/><a href="“http://www.arkansashighways.com/news/2011/Bid" 2011 October News Nevada.pdf”>Arkansas State Highway Commission Opens Bids For Improvements in Nevada County</a><br/><a href="“http://www.arkansashighways.com/news/2011/Bid" 2011 October News Newton.pdf”>Arkansas State Highway Commission Opens Bids For Improvements in Newton County</a><br/><a href="“http://www.arkansashighways.com/news/2011/Bid" 2011 October News Pulaski.pdf”>Arkansas State Highway Commission Opens Bids For Improvements in Pulaski County</a><br/><a href="“http://www.arkansashighways.com/news/2011/Bid" 2011 October News Washington.pdf”>Arkansas State Highway Commission Opens Bids For Improvements in Washington County</a><br/>]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Fri, 29 Apr 2011 14:30:25 GMT</pubDate>
      <guid isPermaLink="false">9E19B857-4138-41AF-A15B-83660F48A497</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p>
<a hef="http://www.arkansashighways.com/news/2011/070.pdf">Improvements to Interstate 440 in North Little Rock to Require Lane Closure</a></p>
<p><a href="http://www.arkansashighways.com/news/2011/067.pdf">AHTD to Hold Public Meetings Regarding Proposed Improvement to Highway 82</a></p>
<p>&nbsp;</p>]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Mon, 25 Apr 2011 20:26:52 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/066.pdf</link>
      <guid isPermaLink="false">8E0560B6-660E-4F96-97A2-47D8540C9109</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<a href="http://www.arkansashighways.com/news/2011/066.pdf">Improvement to Pedestrian Overpass to Require Lane Closure in Interstate 430</a>]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Fri, 15 Apr 2011 19:22:20 GMT</pubDate>
      <link>http://www.arkansashighways.com/</link>
      <guid isPermaLink="false">A2988EDF-6681-48F0-9A00-6E6145FC7303</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<a href="http://www.arkansashighways.com/news/2011/059.pdf">Improvements to Interstate 40 in North Little Rock to Require Lane Closure</a>
<p><a href="http://www.arkansashighways.com/news/2011/060.pdf">Improvemets to Highway 67 at The Lonoke/White County Line to Require Lane Closure</a></p>
<p><a href="http://www.arkansashighways.com/news/2011/061.pdf">Improvements to Highway 67 in Pulaski County to Require Lane Closure</a></p>
<p><a href="http://www.arkansashighways.com/news/2011/062.pdf">Inspection on Interstate 430 Bridge Will Require Lane Closure</a></p>
<p>&nbsp;</p>]]></description>
    </item>
    <item>
      <title>Upcoming Events</title>
      <pubDate>Thu, 14 Apr 2011 17:07:02 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/050.pdf</link>
      <guid isPermaLink="false">48946060-699D-4445-B89D-4A9B1F0D6102</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p>04/18/11 AHTD to Hold Public Meetings on Road Damage - 6:30 p.m. - Morrilton, AR</p>
<p>04/19/11 AHTD to Hold Public Meetings on Road Damage - 6:30 p.m. - Quitman, AR</p>
<p>04/21/11 AHTD to Hold Public Meetings on Road Damage - 6:30 p.m. - Searcy, AR</p>]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Tue, 12 Apr 2011 14:29:56 GMT</pubDate>
      <link>http://www.arkansashighways.com</link>
      <guid isPermaLink="false">97FE2400-AE71-4A47-9075-D1BFB07E1259</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p><a href="http://www.arkansashighways.com/news/2011/058.pdf">Work on Martin Luther King Expressway in Hot Springs to Require Lane Closure. </a></p>
<p><a href="http://www.arkansashighways.com/news/2011/057.pdf">Bridge Inspection on Arch Street Pike to Require Lane Closure.</a></p>
<p>&nbsp;</p>
<p>&nbsp;</p>]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Tue, 12 Apr 2011 12:42:18 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/NR11-056.pdf</link>
      <guid isPermaLink="false">A65F8788-AF51-4596-9371-49E06BEC4F1A</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Notice to Media]]></description>
    </item>
    <item>
      <title>Material Division QPL</title>
      <pubDate>Mon, 11 Apr 2011 18:11:21 GMT</pubDate>
      <link>http://www.arkansashighways.com/materials_division/materials.aspx</link>
      <guid isPermaLink="false">30DC0A34-5283-4E4A-A9D5-1BE44DA1B01E</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Qualified Product List PDF's]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Fri, 8 Apr 2011 20:29:20 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/056.pdf</link>
      <guid isPermaLink="false">AA2038F2-9C94-43F9-A807-10741AD01172</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[I-540 Lane Closure Planned in Van Buren]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Fri, 8 Apr 2011 19:58:07 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/050.pdf</link>
      <guid isPermaLink="false">69F0D04D-DA79-4BD1-A2A7-630CC4AF5E9E</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[AHTD to Hold Public Meetings on Road Damage]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Fri, 8 Apr 2011 18:44:08 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/055.pdf</link>
      <guid isPermaLink="false">0F1C549D-00EA-43C6-ADC0-4E6A51BE4565</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Improvements to Interstate 40 in North Little Rock to Require Lane Closure.]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Fri, 8 Apr 2011 15:44:11 GMT</pubDate>
      <link>http://www.arkansashighways.com</link>
      <guid isPermaLink="false">DAEA2CFE-7E63-4946-A4C8-9B5804EE6CC8</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p><a href="http://www.arkansashighways.com/news/2011/054.pdf" target="_self">Notice to Media. </a></p>
<p><a href="http://www.arkansashighways.com/news/2011/053.pdf" target="_self">Railroad Crossing Improvement on Baseline Road in Little Rock to Require Lane Closure.</a></p>
<p><a href="http://www.arkansashighways.com/news/2011/052.pdf" target="_self">Improvement to Highway 67 in Pulaski County to Require Lane Closure.</a></p>]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Thu, 7 Apr 2011 18:56:10 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/051.pdf</link>
      <guid isPermaLink="false">E2EDD844-F57D-43CD-81D0-C3BDED8F26DF</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[NLR/Sherwood Area Lane Closure Westbound I-40 and Hwy 67/167 Affected.]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Tue, 5 Apr 2011 13:11:45 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/049.pdf</link>
      <guid isPermaLink="false">4A22FF04-6B7B-4871-9D64-799DCE07E064</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Improvements to Interstate 30 in Pulaski County to Require Lane Closure.]]></description>
    </item>
    <item>
      <title>Disadvantaged Business Enterprise</title>
      <pubDate>Fri, 25 Mar 2011 20:13:49 GMT</pubDate>
      <link>http://www.arkansashighways.com/dbe/UCP%20Application.pdf</link>
      <guid isPermaLink="false">9D9B568E-81BA-46BE-A6AF-BCB2AAF7CDBE</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<span class="style23">DBE Application - DBE Uniform Certification Application.</span>]]></description>
    </item>
    <item>
      <title>Vehicle Inventory and Assignment</title>
      <pubDate>Fri, 25 Mar 2011 20:11:08 GMT</pubDate>
      <link>http://www.arkansashighways.com/equipment_procurement_division/vehicle_inventory/MARCH%202011%20AHTD%20VEHICLE%20INVENTORY%20AND%20ASSIGNMENT.xls.lnk.pdf</link>
      <guid isPermaLink="false">E0D61E47-CE3B-4235-82C1-7C728D7E3795</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Vehicle Inventory and Assignment.]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Fri, 25 Mar 2011 20:04:33 GMT</pubDate>
      <link>http://www.arkansashighways.com/</link>
      <guid isPermaLink="false">3F003E85-F6FC-4D0B-8456-B35A53A2E9DD</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p>Improvements to Highway 67 in Pulaski County to Require Lane Closure.</p>
<p>Improvements to Interstate 30 in North Little Rock to Require Lane Closure.</p>
<p>Improvements to Interstate 30 in Hot Spring County to Require Lane Closure.</p>]]></description>
    </item>
    <item>
      <title>Updated List of the Ten Construction Districts</title>
      <pubDate>Thu, 17 Mar 2011 13:12:20 GMT</pubDate>
      <link>http://www.arkansashighways.com/construction_division/ListofDistricts1.pdf</link>
      <guid isPermaLink="false">D8035459-CA7C-4923-819B-E9C15210393C</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p>Updated List of the Ten Construction Districts.</p>]]></description>
    </item>
    <item>
      <title>ARRA Update</title>
      <pubDate>Mon, 14 Mar 2011 13:33:51 GMT</pubDate>
      <link>http://web/ARRA/arra2009.aspx</link>
      <guid isPermaLink="false">C18CDC73-2EAB-4599-A7FF-2FA826BF1B67</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Udated Highway Project List and Map.]]></description>
    </item>
    <item>
      <title>New Entry</title>
      <pubDate>Mon, 14 Mar 2011 12:58:12 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/037.pdf</link>
      <guid isPermaLink="false">D473DD57-8C5C-4CEA-A890-739F8A6473F3</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Improvements to Interstate 430/630 Interchange to Require Lane Closure.]]></description>
    </item>
    <item>
      <title>New Entry</title>
      <pubDate>Mon, 14 Mar 2011 12:56:24 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/036.pdf</link>
      <guid isPermaLink="false">A72F988F-FE61-42A8-8F64-393C15C27744</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[AHTD to Hold Public Meeting to Discuss the Status of the Highway 63 Black River Bridge.]]></description>
    </item>
    <item>
      <title>ARRA Update</title>
      <pubDate>Wed, 9 Mar 2011 19:57:07 GMT</pubDate>
      <link>http://www.arkansashighways.com/ARRA/update_03092011/ARRA%20map_03_08_2011.pdf</link>
      <guid isPermaLink="false">FB0A9360-07DE-4747-B9E1-51B8BCDDA935</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[ARRA Project Highway Map.]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Wed, 9 Mar 2011 19:41:33 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/035.pdf</link>
      <guid isPermaLink="false">1DC1FBD5-1CDD-4BFF-BE5E-CEAA7EC5D5C4</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Improvements to Beaver Bridge in Carroll County to Require Temporary Closures.]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Tue, 8 Mar 2011 20:31:16 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/034.pdf</link>
      <guid isPermaLink="false">FF12D4FD-0D03-4DB9-B205-A209CACFF1F1</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Forrest City Bypass Closed Thursday Railroad Repairs to be Made.]]></description>
    </item>
    <item>
      <title>ARRA Update</title>
      <pubDate>Tue, 8 Mar 2011 14:02:23 GMT</pubDate>
      <link>http://www.arkansashighways.com/ARRA/update_03082011/ARRA%203-7-11.pdf</link>
      <guid isPermaLink="false">16ED4221-F56C-44B2-ABED-231EF1CE5504</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<font size="+0"><font face="ArialNarrow,BoldItalic">
<p align="left">Projects to be Advanced Using American Recovery and Reinvestment Act (ARRA) Funds.</p></font></font>]]></description>
    </item>
    <item>
      <title>Nesw Entry</title>
      <pubDate>Tue, 8 Mar 2011 13:53:02 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/033.pdf</link>
      <guid isPermaLink="false">79A0388F-3BD4-40A5-BBD1-05BFD96E5537</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Improvements to Martin Luther King Expressway in Hot Springs to Require Lane Closure.]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Tue, 8 Mar 2011 13:51:24 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/032.pdf</link>
      <guid isPermaLink="false">F4780913-4F1A-4CCF-9985-5018DEE41A3C</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Improvements to Interstate 40 in Prairie County to Require Lane Closure.]]></description>
    </item>
    <item>
      <title>Monthly CenterLine Employee Newsletter</title>
      <pubDate>Fri, 4 Mar 2011 15:12:32 GMT</pubDate>
      <link>http://www.arkansashighways.com/newsletters/newsletter.aspx</link>
      <guid isPermaLink="false">785E8514-EE30-4EB0-9374-251C19423EF7</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Monthly CenterLine Employee Newsletter February 2011.]]></description>
    </item>
    <item>
      <title>Updated Minutes of the meeting of The Arkansas State Highway Commission</title>
      <pubDate>Fri, 4 Mar 2011 13:42:30 GMT</pubDate>
      <link>http://www.arkansashighways.com/minute_orders/Mo2010-2019.pdf</link>
      <guid isPermaLink="false">D10AC60C-8365-4FB9-BD5E-B3456FF3EE93</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Minutes of the meeting of The Arkansas State Highway Commission.]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Fri, 4 Mar 2011 13:32:23 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/031.pdf</link>
      <guid isPermaLink="false">340E7E68-CE1F-4344-BFAC-7599A1B87FEC</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Improvements to Interstate 440 in Pulaski County to Require Lane Closure.]]></description>
    </item>
    <item>
      <title>Planning and Research Problem Statements for 2011</title>
      <pubDate>Tue, 1 Mar 2011 16:16:53 GMT</pubDate>
      <link>http://www.arkansashighways.com/planning_research/research/problem_statement.aspx</link>
      <guid isPermaLink="false">25FE6154-8333-4CA3-889F-AF4FDB4A9414</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p>Added Problem Statements for 2011.</p>]]></description>
    </item>
    <item>
      <title>Safe Route to School</title>
      <pubDate>Tue, 1 Mar 2011 16:14:43 GMT</pubDate>
      <link>http://www.arkansashighways.com/safe_route/safe_route.aspx</link>
      <guid isPermaLink="false">78D5CE97-8494-4CF2-859E-F011276422A9</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Converted and added Applications from .doc to form .pdf also, updated navigational bar as requested.]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Wed, 23 Feb 2011 22:06:57 GMT</pubDate>
      <link>http://www.arkansashighways.com/</link>
      <guid isPermaLink="false">6C5057FE-1389-4EB0-BE3C-C1621CD78AFB</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p>Improvements to Highway 67 in Pulaski County to Require Lane Closure.</p>
<p>Improvements to Interstate 40 in Pulaski County to Require Nighttime Closure of On-Ramp at Levy.</p>]]></description>
    </item>
    <item>
      <title>Upcoming Public Meeting</title>
      <pubDate>Wed, 23 Feb 2011 15:26:15 GMT</pubDate>
      <link>http://www.arkansashighways.com/public_meetings/2011/R50116/R50116.aspx</link>
      <guid isPermaLink="false">67AA0A13-B311-40AF-9744-BB37320D2CAC</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p>WHAT: Public Involvement Meeting - Little Raccoon Creek - Cove Prong Creek (Hwy. 5)<br>WHEN: Thursday, March 3, 2011 4:00 p.m. to 7:00 p.m.<br>WHERE: Arbanna Baptist Church, 7554 Hwy. 5 in Mt. View<br>CONTACT: Ruby Jordan, Section Head - Public Involvement </p>]]></description>
    </item>
    <item>
      <title>Notice to Media</title>
      <pubDate>Tue, 22 Feb 2011 15:50:15 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/025.pdf</link>
      <guid isPermaLink="false">ADDA5C99-D775-42AB-B604-D6AE39D58571</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Notice to Media.]]></description>
    </item>
    <item>
      <title>Updated AHTD Organizational Chart</title>
      <pubDate>Fri, 18 Feb 2011 21:03:33 GMT</pubDate>
      <link>http://www.arkansashighways.com/about/about_ahtd.aspx</link>
      <guid isPermaLink="false">065218E9-2F81-4DCD-9FD0-89224CDE5888</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Updated AHTD Organizational Chart.]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Fri, 18 Feb 2011 20:02:02 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/024.pdf</link>
      <guid isPermaLink="false">3637993E-024B-4FD0-8EC3-5DBCEDE514F3</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Highway 63 Black River Bridge Weight Limit Changing.]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Fri, 18 Feb 2011 14:44:28 GMT</pubDate>
      <link>http://arkansashighways.com/news/2011/023.pdf</link>
      <guid isPermaLink="false">2D6090F0-A2D2-4FF8-A640-9C9EBFA18142</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Highway 67/167 Lane to Close Crews to Shift Highway 440 Exit.]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Thu, 17 Feb 2011 18:34:16 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/022.pdf</link>
      <guid isPermaLink="false">93E7CFB4-8DE7-4B94-8047-6151FD6F853D</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Improvements to Interstate 430 in Pulaski County to Require Lane Closure.]]></description>
    </item>
    <item>
      <title>News Entry</title>
      <pubDate>Thu, 17 Feb 2011 13:33:31 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/021.pdf</link>
      <guid isPermaLink="false">EDE89C04-A842-4044-9911-E17DCBE52A8C</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Improvements to Interstate 630 in Pulaski County to Require Lane Closure.]]></description>
    </item>
    <item>
      <title>Policy Analysis Section</title>
      <pubDate>Mon, 14 Feb 2011 17:43:26 GMT</pubDate>
      <link>http://www.arkansashighways.com/planning_research/policy_analysis/annual_fact_sheets.aspx</link>
      <guid isPermaLink="false">90C09806-D6A9-465B-8D81-B499D06E25D1</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Added&nbsp;2010 Facts Sheet.]]></description>
    </item>
    <item>
      <title>Materials Division</title>
      <pubDate>Mon, 14 Feb 2011 15:45:59 GMT</pubDate>
      <link>http://www.arkansashighways.com/materials_division/materials.aspx</link>
      <guid isPermaLink="false">6DD16BFA-74DC-4F4A-891C-7E05EBF88177</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Updated Qualified Products.]]></description>
    </item>
    <item>
      <title>News Update</title>
      <pubDate>Mon, 14 Feb 2011 13:36:41 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/017.pdf</link>
      <guid isPermaLink="false">BB7A5D0B-326B-4463-B9C7-1B0E07242599</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p align="left">
<p><font size="3">Officials with the Arkansas State Highway and Transportation Department (AHTD) have announced that they are deferring previously announced new weight limits on several State Highways in the Fayetteville shale areas. <p></font>]]></description>
    </item>
    <item>
      <title>New Entry</title>
      <pubDate>Mon, 14 Feb 2011 13:36:30 GMT</pubDate>
      <guid isPermaLink="false">2620061F-CBC2-4999-93A2-DDF5E0FF8ABE</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[]]></description>
    </item>
    <item>
      <title>News Update</title>
      <pubDate>Fri, 11 Feb 2011 16:14:25 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/018.pdf</link>
      <guid isPermaLink="false">330341E2-367E-4393-9163-AE60166ABFB3</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Improvements to Interstate 40 in Prairie County to Require Lane Closure]]></description>
    </item>
    <item>
      <title>Minutes of the meeting of The Arkansas State Highway Commission</title>
      <pubDate>Tue, 8 Feb 2011 15:24:39 GMT</pubDate>
      <link>http://www.arkansashighways.com/minute_orders/minute_orders.aspx</link>
      <guid isPermaLink="false">2A87EB2A-3F76-4EE5-8FAC-8B579C64D143</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Updated Minutes of the meeting of The Arkansas State Highway Commission.]]></description>
    </item>
    <item>
      <title>New Entry</title>
      <pubDate>Tue, 8 Feb 2011 15:24:03 GMT</pubDate>
      <guid isPermaLink="false">FE55C976-5393-48BE-AA83-6B06517E3ACB</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[]]></description>
    </item>
    <item>
      <title>News Update</title>
      <pubDate>Wed, 2 Feb 2011 13:44:38 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/014.pdf</link>
      <guid isPermaLink="false">346DC766-6DEC-4F2C-AE4B-A9460B9060CC</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Work Continuing on Interstate 430 Bridge:&nbsp;Will Require Lane Closure]]></description>
    </item>
    <item>
      <title>News Update</title>
      <pubDate>Mon, 31 Jan 2011 13:44:08 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/011.pdf</link>
      <guid isPermaLink="false">4C056D75-9452-4A53-B913-A9D7B2EC723C</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Improvements on Interstate 430 Bridge will Require Lane Closure.]]></description>
    </item>
    <item>
      <title>News Update</title>
      <pubDate>Fri, 28 Jan 2011 17:09:41 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2011/010.pdf</link>
      <guid isPermaLink="false">E4F0BD9D-7E6A-4CD7-9992-981FF082EA29</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p align="left">Railroad Crossing Improvements on S. Arch Street in Pulaski County to Require Lane Closure.</p>]]></description>
    </item>
    <item>
      <title>Consultant Contract Information Advertisement</title>
      <pubDate>Wed, 26 Jan 2011 21:58:27 GMT</pubDate>
      <link>http://www.arkansashighways.com/consultant_services/advertisements/advertisements.aspx</link>
      <guid isPermaLink="false">C9681997-E04A-44B4-B640-D6DCB57A7A68</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Consultant Contract Information Advertisement.]]></description>
    </item>
    <item>
      <title>Updated AHTD Bridge Cost</title>
      <pubDate>Wed, 26 Jan 2011 21:57:27 GMT</pubDate>
      <link>http://www.arkansashighways.com/bridge_division/ahtd_bridge_cost.aspx</link>
      <guid isPermaLink="false">BFFBB460-533A-4C08-9D19-08F150B8C5BA</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Updated AHTD Bridge Cost.]]></description>
    </item>
    <item>
      <title>Updated Bridge Bid Tabulations</title>
      <pubDate>Wed, 26 Jan 2011 21:56:05 GMT</pubDate>
      <link>http://www.arkansashighways.com/bridge_division/bidtabs/bridge_bid_tabulations.aspx</link>
      <guid isPermaLink="false">5366390B-4A92-4318-B605-81339914CE8F</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Updated Bridge Bid Tabulations]]></description>
    </item>
    <item>
      <title>49th Biennial Report</title>
      <pubDate>Wed, 26 Jan 2011 17:43:18 GMT</pubDate>
      <link>http://www.arkansashighways.com/annual_biennial_report.aspx</link>
      <guid isPermaLink="false">6825CD1E-9F06-4F88-9D2F-A898181345C0</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[49th Biennial Report added to the web site.]]></description>
    </item>
    <item>
      <title>News Update.</title>
      <pubDate>Tue, 25 Jan 2011 21:24:41 GMT</pubDate>
      <link>http://www.arkansashighways.com/</link>
      <guid isPermaLink="false">2D081A6E-E0F5-49E5-8321-CAEC212D67D3</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[]]></description>
    </item>
    <item>
      <title>Document Updates in Division/Planning and Research/Research</title>
      <pubDate>Tue, 25 Jan 2011 21:21:31 GMT</pubDate>
      <link>http://www.arkansashighways.com/planning_research/research/research.aspx</link>
      <guid isPermaLink="false">35E9C8CE-7CE1-477F-8C16-850D96FB27D1</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p>Document Updates</p>]]></description>
    </item>
    <item>
      <title>Employment Application PDF Format</title>
      <pubDate>Tue, 25 Jan 2011 18:31:59 GMT</pubDate>
      <link>http://www.arkansashighways.com/Employment/F19_126.pdf</link>
      <guid isPermaLink="false">53361E76-5A4A-4609-8CA4-CEF3CD1E76C6</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Employment Application Form 19-126 revised 1/2011]]></description>
    </item>
    <item>
      <title>Active Mack-Blackwell Rural Transportation Center (MBTC) Projects Updates</title>
      <pubDate>Tue, 25 Jan 2011 18:28:09 GMT</pubDate>
      <link>http://www.arkansashighways.com/planning_research/research/research.aspx</link>
      <guid isPermaLink="false">0F92059D-15B2-4336-8FC9-2634DD4E8A77</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[(Research/Projects) Active Mack-Blackwell Rural Transportation Center (MBTC) Projects Updates.]]></description>
    </item>
    <item>
      <title>Upcoming Events</title>
      <pubDate>Mon, 24 Jan 2011 21:13:33 GMT</pubDate>
      <link>http://www.arkansashighways.com/consultant_services/advertisements/advertisements.aspx</link>
      <guid isPermaLink="false">166CFEE2-506E-4DF8-ADCF-7E021CF26A02</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Added Events]]></description>
    </item>
    <item>
      <title>AHTD Salary Schedule 12/30/2010</title>
      <pubDate>Thu, 30 Dec 2010 14:05:56 GMT</pubDate>
      <guid isPermaLink="false">FCBF5AD2-8DAE-4A67-A5DB-82A654B34295</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Added AHTD Salary Schedule 12/30/2010]]></description>
    </item>
    <item>
      <title>2010 State Highway (tourist) map added</title>
      <pubDate>Wed, 29 Dec 2010 17:58:39 GMT</pubDate>
      <guid isPermaLink="false">0D66CFAE-F90A-4F48-B5DF-4A4ADCB0F563</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[2010 State Highway (tourist) map added.]]></description>
    </item>
    <item>
      <title>Upcoming Events</title>
      <pubDate>Tue, 28 Dec 2010 16:23:04 GMT</pubDate>
      <guid isPermaLink="false">C61CA693-CFC1-4784-8205-64F890DA3C32</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Regular Meeting of the Board of Trustees of the Arkansas State Highway Employees Retirement System.]]></description>
    </item>
    <item>
      <title>2009 Annual Report</title>
      <pubDate>Mon, 27 Dec 2010 17:22:42 GMT</pubDate>
      <link>http://arkansashighways.com/annual_report/annual_reports.aspx</link>
      <guid isPermaLink="false">AFDB0304-639E-4B19-B811-69CF50B8DF26</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[2009 Annual Report]]></description>
    </item>
    <item>
      <title>Consultant Contract Information Advertisements</title>
      <pubDate>Fri, 17 Dec 2010 15:36:10 GMT</pubDate>
      <link>http://www.arkansashighways.com/consultant_services/advertisements/advertisements.aspx</link>
      <guid isPermaLink="false">E85CF1F1-3C9A-46BE-9276-0FEE09765416</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p>City of West Memphis-Request for Letters of Interest for Construction Inspection Services available until 1/7/11</p>]]></description>
    </item>
    <item>
      <title>Public Transportation Program</title>
      <pubDate>Thu, 16 Dec 2010 15:14:44 GMT</pubDate>
      <link>http://www.arkansashighways.com/public_transportation/public_transportation.aspx</link>
      <guid isPermaLink="false">6AD5E82B-FC2B-4357-AE4C-A57F51C9FE76</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p>The 2012 Application period is now OPEN. The deadline is Wednesday, March 2, 2011</p>]]></description>
    </item>
    <item>
      <title>Improvements to Interstate 40 in Prairie County to Require Lane Closures added to news</title>
      <pubDate>Tue, 14 Dec 2010 17:46:51 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2010/143.pdf</link>
      <guid isPermaLink="false">6D202C8F-E182-462C-91CB-83B1F8846BC6</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Improvements to Interstate 40 in Prairie County to Require Lane Closures]]></description>
    </item>
    <item>
      <title>Updates to Districts Construction Projects</title>
      <pubDate>Tue, 14 Dec 2010 14:07:20 GMT</pubDate>
      <guid isPermaLink="false">CDF52FF8-15C7-4D5F-9468-6DFB2CF068AF</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Updates to all Districts Construction Projects.]]></description>
    </item>
    <item>
      <title>Updated Minutes of the meeting of The Arkansas State Highway Commission</title>
      <pubDate>Thu, 9 Dec 2010 21:20:50 GMT</pubDate>
      <link>http://www.arkansashighways.com/minute_orders/minute_orders.aspx</link>
      <guid isPermaLink="false">44FDEDFE-A624-434A-ABC0-36E95CA0E748</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Minutes of the meeting of The Arkansas State Highway Commission.]]></description>
    </item>
    <item>
      <title>Items Added to News</title>
      <pubDate>Thu, 9 Dec 2010 13:57:13 GMT</pubDate>
      <guid isPermaLink="false">F9E2409D-5A98-4326-8C49-B726F3F475E3</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p><a href="http://www.arkansashighways.com/news/2010/140.pdf" target="_blank">AHTD to Hold Public Meeting in Bryant</a><br><br><a href="http://www.arkansashighways.com/news/2010/141.pdf" target="_blank">Improvements to Rail Crossing on Baseline Road will Require Lane Closure</a><br></p>
<p>&nbsp;</p>]]></description>
    </item>
    <item>
      <title>(Planning Study) - Public Involvement Meeting Pulaski Co. Line (Widening) (Hwy. 5)</title>
      <pubDate>Tue, 7 Dec 2010 21:20:17 GMT</pubDate>
      <link>http://www.arkansashighways.com/public_meetings/2010/061262/061262.aspx</link>
      <guid isPermaLink="false">8257088C-B0B1-4BF7-A334-F54C90DDC5C6</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p>(Planning Study) - Public Involvement Meeting Pulaski Co. Line (Widening) (Hwy. 5)<br>Tuesday, December 14, 2010 4:00 p.m. to 7:00 p.m.<br>First Pentecostal Church, 4200 Hwy. 5 North in Bryant<br></p>
<p>&nbsp;</p>]]></description>
    </item>
    <item>
      <title>Director's Message</title>
      <pubDate>Tue, 7 Dec 2010 19:42:16 GMT</pubDate>
      <link>http://www.arkansashighways.com/directors_message_12072010.aspx</link>
      <guid isPermaLink="false">6CCF2A97-C595-44F3-9414-E9A1D3C07644</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Updated Director's Message]]></description>
    </item>
    <item>
      <title>Arkansas Highways Magazine Fall 2010</title>
      <pubDate>Tue, 7 Dec 2010 18:53:25 GMT</pubDate>
      <link>http://www.arkansashighways.com/magazine.aspx</link>
      <guid isPermaLink="false">C996178E-568B-449C-82EA-8AEF3D6E0CAB</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Added Arkansas Highways Magazine Fall 2010]]></description>
    </item>
    <item>
      <title>Materials Division QPL Updates</title>
      <pubDate>Fri, 3 Dec 2010 16:18:29 GMT</pubDate>
      <link>http://www.arkansashighways.com/materials_division/materials.aspx</link>
      <guid isPermaLink="false">310D537E-2929-4F09-B338-829176AB870D</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Material Division Qualified Product List Updated.]]></description>
    </item>
    <item>
      <title>Information Releases added to News on AHTD main page</title>
      <pubDate>Mon, 29 Nov 2010 20:26:33 GMT</pubDate>
      <link>http://www.arkansashighways.com/</link>
      <guid isPermaLink="false">56299196-1104-49E0-AD8F-7BD84B2DE05B</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[]]></description>
    </item>
    <item>
      <title>Design Build Guidelines and Procedures</title>
      <pubDate>Wed, 24 Nov 2010 15:49:38 GMT</pubDate>
      <link>http://www.arkansashighways.com/consultant_services/publications/Design_Build%20Procedures_Final.pdf</link>
      <guid isPermaLink="false">C0424622-6F99-4426-9E02-1D6B5A8C366C</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Added Design Build Guidelines and Procedures.]]></description>
    </item>
    <item>
      <title>Standard Roadway Drawings Metric</title>
      <pubDate>Wed, 24 Nov 2010 15:00:35 GMT</pubDate>
      <link>http://www.arkansashighways.com/roadway_design_division/metric/metric.aspx</link>
      <guid isPermaLink="false">E553BBEA-89CE-41FE-B5DA-9ECCE9151EE3</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Updated Standard Roadway Drawings Metric]]></description>
    </item>
    <item>
      <title>Standard Roadway Drawings US Units</title>
      <pubDate>Wed, 24 Nov 2010 14:58:37 GMT</pubDate>
      <link>http://www.arkansashighways.com/roadway_design_division/usunits/usunit.aspx</link>
      <guid isPermaLink="false">EF27D83B-A1F4-49B0-8892-B7AD202F07F8</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Updated Drawings for Standard Roadway Drawings US Units.]]></description>
    </item>
    <item>
      <title>ARRA Project Highway List</title>
      <pubDate>Wed, 24 Nov 2010 14:05:54 GMT</pubDate>
      <link>http://www.arkansashighways.com/ARRA/update_11222010/ARRA%2011-22-10.pdf</link>
      <guid isPermaLink="false">DCA20AFD-2A6A-4028-8E60-6712CBC4DBA3</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Updated ARRA Project Highway List.]]></description>
    </item>
    <item>
      <title>ARRA Project Highway Map</title>
      <pubDate>Fri, 19 Nov 2010 17:31:26 GMT</pubDate>
      <link>http://web/ARRA/arra2009.aspx</link>
      <guid isPermaLink="false">457B3343-DAEF-4F0C-9FB9-FB2B5EECB69B</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Updated ARRA Project Highway Map.]]></description>
    </item>
    <item>
      <title>ARRA Current Reports</title>
      <pubDate>Thu, 18 Nov 2010 21:22:31 GMT</pubDate>
      <link>http://www.arkansashighways.com/ARRA/current_reports.aspx</link>
      <guid isPermaLink="false">F37CAE25-97FB-4362-A2BE-917C707A50CC</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Updated Transportation &amp; Infrastructure Committee Reports.]]></description>
    </item>
    <item>
      <title>Walking and Wheeling Newsletter</title>
      <pubDate>Wed, 17 Nov 2010 21:15:11 GMT</pubDate>
      <link>http://www.arkansashighways.com/safe_route/walking_wheeling_newsletter.aspx</link>
      <guid isPermaLink="false">772F2851-14A2-4F0C-9CF5-3545711856CF</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p>Walking and Wheeling October / November Newsletter</p>]]></description>
    </item>
    <item>
      <title>Added Form to Bridge Rating and Inventory</title>
      <pubDate>Fri, 12 Nov 2010 20:06:12 GMT</pubDate>
      <link>http://www.arkansashighways.com/bridge_division/bridge_rating_inventory.aspx</link>
      <guid isPermaLink="false">D6B80DB9-EB07-4AB5-A00F-FAEC52C37971</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Added Local Government notification to AHTD of bridge data revision form to Bridge Rating and Inventory in&nbsp;Bridge Division.]]></description>
    </item>
    <item>
      <title>Sample contracts</title>
      <pubDate>Fri, 12 Nov 2010 16:05:33 GMT</pubDate>
      <link>http://www.arkansashighways.com/consultant_services/sample_contracts.aspx</link>
      <guid isPermaLink="false">47A48353-EF93-4BB5-853E-DDDACF081CFD</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Update Sample Contracts, Consultant Contractor Information, Consultant Services.]]></description>
    </item>
    <item>
      <title>Materials Division QPL Update</title>
      <pubDate>Tue, 9 Nov 2010 18:47:58 GMT</pubDate>
      <link>http://www.arkansashighways.com/materials_division/materials.aspx</link>
      <guid isPermaLink="false">9A7385F2-16B7-4268-9E56-865437536C03</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Updates to Materials Division Qualified Product List]]></description>
    </item>
    <item>
      <title>Content added to News</title>
      <pubDate>Fri, 5 Nov 2010 21:48:41 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2010/131.pdf</link>
      <guid isPermaLink="false">42C96AE4-3D90-48D0-BDB6-9CC2E9F5A06B</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[Inspection on Interstate 440 Railroad Overpass will Require Lane Closure]]></description>
    </item>
    <item>
      <title>Metropolitan Planning Organization (MPO) Coordination</title>
      <pubDate>Thu, 4 Nov 2010 19:03:33 GMT</pubDate>
      <link>http://www.arkansashighways.com/planning_research/statewide_planning/mpo.aspx</link>
      <guid isPermaLink="false">1B983ACB-40D4-48D3-AC12-52750FFC323F</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p>Updated Contact Information for&nbsp;Metropolitan Planning Organization.</p>]]></description>
    </item>
    <item>
      <title>Content added to News</title>
      <pubDate>Wed, 3 Nov 2010 16:51:29 GMT</pubDate>
      <link>http://www.arkansashighways.com/news/2010/128.pdf</link>
      <guid isPermaLink="false">B0CAF2F4-793C-4451-B03A-3937F814780A</guid>
      <author>info@arkansashighways.com</author>
      <description><![CDATA[<p align="left">
<p>AHTD&nbsp;to&nbsp;Hold Public Meeting&nbsp;in SEARCY<strong> </strong>
<p>]]></description>
    </item>
  </channel>
</rss>